ERP migration

Migrate from Proteus E12ERP to Dolibarr ERP

Field-level mapping, validation, and rollback between Proteus E12ERP and Dolibarr ERP. We move data and schema; workflows are rebuilt natively in Dolibarr ERP.

Proteus E12ERP logo

Proteus E12ERP

Source

Dolibarr ERP

Destination

Dolibarr ERP logo

Compatibility

76%

13 of 17

objects map 1:1 between Proteus E12ERP and Dolibarr ERP.

Complexity

BStandard

Timeline

3-5 weeks

Rollback included Accuracy guarantee Field-level validation

Overview

What this migration involves

Moving from Proteus E12ERP to Dolibarr is a migration from a single-tenant Indian-market ERP to a self-hosted open-source ERP/CRM with a different module architecture. Proteus E12ERP organizes data around Revenue Centers, Customers, Vendors, Inventory Items, and Sales/Purchase Orders with a flat relational export structure. Dolibarr uses a modular plugin model where modules must be explicitly activated before their objects become available. We sequence the Proteus export by module to respect its relational structure (accounts before transactions, vendors before purchase orders), configure the Dolibarr destination with the relevant modules enabled before load, and map Revenue Centers to Dolibarr Projects with optional cost-centre categorization. Open AP/AR (unpaid invoices and outstanding purchase orders) is not documented as an exportable object in Proteus E12ERP; we flag this as a gap requiring manual re-entry post-migration. Workflows, automations, and custom procedures built in Proteus do not migrate as code; we deliver a written inventory for the customer's admin to rebuild in Dolibarr.

Field-level fidelity

Every standard and custom field arrives verified.

Schema-aware mapping

AI proposes the map; you confirm before any record moves.

Relationships preserved

Parent–child, lookups, and ownership stay linked.

Full activity history

Calls, emails, meetings — with original timestamps.

Attachments & notes

Documents, uploads, and inline notes move with the record.

Why teams make this switch

Two sides of the same decision

Leaving

Proteus E12ERP logo

Proteus E12ERP

What's pushing teams away

  • Smaller vendor footprint than Tier-1 ERPs (SAP, Oracle, NetSuite, Microsoft Dynamics) limits global consultant availability and partner ecosystem.
  • Pricing data is inconsistent across third-party listings (Capterra Ireland and SoftwareSuggest report different entry-point prices), creating procurement confusion.
  • Limited public API documentation makes custom integrations with modern BI, e-commerce, or logistics systems harder than with API-first ERPs.
  • Customers expanding internationally outside Ireland/India coverage may need to migrate to multi-country ERPs with broader localization.
  • Smaller public review footprint makes peer-reference due diligence challenging for buyers comparing against mainstream mid-market ERPs.

Choosing

Dolibarr ERP logo

Dolibarr ERP

What's pulling them in

  • Free open-source core with no per-user license fee makes it the lowest-cost entry point for small teams needing ERP and CRM in one package.
  • Self-hosted deployment gives full data ownership and eliminates vendor lock-in, especially attractive to businesses with compliance requirements.
  • Modular architecture means teams enable only the features they use, keeping the interface uncluttered and reducing learning curve.
  • Fast installation with no technical knowledge required — one reviewer set up multiple businesses in minutes using their own hosting.
  • Active community forum and marketplace of third-party add-ons provide support and extension options without mandatory subscription costs.

Object mapping

How Proteus E12ERP objects map to Dolibarr ERP

Each row shows how a Proteus E12ERP object lands in Dolibarr ERP, including any object-level transformations, lookup resolution, or schema-design dependencies.

Typical mapping — final map is confirmed during the sample migration step.

Proteus E12ERP

Customer

maps to

Dolibarr ERP

ThirdParty (societe)

1:1
Fully supported

Proteus E12ERP Customer records map to Dolibarr ThirdParty objects with type=T. We extract customer name, address fields, contact phone, email, and GST/tax identification from the delimited export. Dolibarr stores third-party addresses in the llx_socpeople table linked to llx_societe; we resolve the contact-to-third-party relationship at migration time. Any lifecycle or stage property from Proteus maps to a Dolibarr extrafield or category.

Proteus E12ERP

Vendor

maps to

Dolibarr ERP

ThirdParty (societe)

1:1
Fully supported

Proteus E12ERP Vendor records map to Dolibarr ThirdParty objects with type=F (fournisseur). We extract vendor name, contact details, and payment terms. Dolibarr requires the Supplier module to be activated before vendor objects are accessible; we verify module activation during the configuration step. Vendor ID references from Purchase Orders are resolved by creating vendors before purchase order records.

Proteus E12ERP

Inventory Item

maps to

Dolibarr ERP

Product (produit)

1:1
Fully supported

Proteus E12ERP Inventory Items with SKU, description, unit cost, and quantity on hand map to Dolibarr Product records. We distinguish between product types: items with stock tracking map to Dolibarr type=0 (stockable), service-only items map to type=1 (service). Quantity on hand migrates as an initial stock value into llx_product_stock with the relevant warehouse reference. Dolibarr requires the Stock module to be activated for warehouse tracking to function.

Proteus E12ERP

Sales Order

maps to

Dolibarr ERP

Order (commande)

1:1
Fully supported

Proteus E12ERP Sales Orders map to Dolibarr Customer Order objects (commande client). The Proteus order status (open, dispatched, closed) maps to Dolibarr Statut values (0=draft, 1=validated, 2=shipped, 3=delivered, etc.). Line items map to llx_commandedet with Product references resolved via SKU lookup, and order totals compute from quantity multiplied by unit price. We preserve the customer reference and order date.

Proteus E12ERP

Purchase Order

maps to

Dolibarr ERP

Order (commande_fournisseur)

1:1
Fully supported

Proteus E12ERP Purchase Orders map to Dolibarr Supplier Order objects (commande_fournisseur). Vendor ID references resolve to the Dolibarr ThirdParty supplier created in the vendor migration step. PO status (open, received, closed) maps to Dolibarr Statut values. Line items map to llx_commandedet_fournisseur with Product references resolved by SKU. Receipt of goods workflow in Dolibarr (reception against purchase order) is documented separately as a post-migration procedure.

Proteus E12ERP

Revenue Center

maps to

Dolibarr ERP

Project (projet)

lossy
Fully supported

Proteus E12ERP Revenue Centers represent branches or cost centres in a multi-location setup and are a non-standard ERP concept. We map each Revenue Center to a Dolibarr Project with the project type set to internal or customer-facing as appropriate. Cost-centre categorization within Dolibarr's accounting module requires the accounting module to be activated and may need account-level cost-centre configuration by the customer's admin post-migration. This is the highest-complexity object mapping in the pair because Revenue Centers have no native Dolibarr equivalent.

Proteus E12ERP

Chart of Accounts

maps to

Dolibarr ERP

Account (compte_comptable)

1:1
Mapping required

Proteus E12ERP Chart of Accounts records with account codes and types map to Dolibarr's accounting module llx_accounting_account. Account type (asset, liability, income, expense) maps directly. Currency denomination from Proteus migrates to Dolibarr account currency fields if multi-currency accounting is enabled. Dolibarr's accounting module must be activated before importing chart-of-accounts records; the first account in each class acts as the class header in Dolibarr.

Proteus E12ERP

Open AP/AR

maps to

Dolibarr ERP

Invoice (facture)

1:1
Not supported

Open invoice state (unpaid purchase orders and outstanding customer invoices) is not documented as an exportable object in Proteus E12ERP's CSV evidence. We cannot migrate open AP or open AR as a direct record load. We flag this gap in the migration scope and recommend that customers export open invoice data manually from Proteus reports and re-enter them as draft invoices in Dolibarr's invoice module post-migration, setting the status to unpaid with the original due date preserved. This is a manual step outside the automated migration scope.

Proteus E12ERP

Engagement: Call Log

maps to

Dolibarr ERP

Event (actioncomm)

1:1
Fully supported

Proteus E12ERP call logs and meeting records map to Dolibarr Agenda events (actioncomm). Call duration, date, and outcome map to Dolibarr fields daterun, duration, and note. Dolibarr's Agenda module must be activated before event records load. Attendee and participant associations from Proteus map to Dolibarr's llx_actioncomm_resources table. Note that Dolibarr's recurring event feature has known limitations per community reports; we document this as a post-migration configuration note.

Proteus E12ERP

Engagement: Email Thread

maps to

Dolibarr ERP

Note or Document (note or document)

1:1
Fully supported

Email content and thread history exported from Proteus E12ERP migrates to Dolibarr Note records (note) linked to the relevant ThirdParty or Order via llx_element_contact. Dolibarr stores email attachments as Document records in the llx_document_model table linked to the parent element. We preserve the original email date, sender, recipient, and body. Dolibarr does not have a native threaded email object; thread ordering is preserved by date sequence in the linked Note records.

Proteus E12ERP

Engagement: Task

maps to

Dolibarr ERP

Task (actioncomm with type=TASK)

1:1
Fully supported

Task records from Proteus E12ERP including task title, description, due date, status, and assigned owner map to Dolibarr Actioncomm records with type=TASK. Owner assignment in Proteus maps to the corresponding Dolibarr User by email match. Tasks linked to specific Customer or Order records resolve their llx_element_element foreign key during migration by looking up the target record by reference.

Proteus E12ERP

Sales Order

maps to

Dolibarr ERP

Proposal (propal)

1:1
Fully supported

If the Proteus E12ERP export exposes pre-confirmation sales proposals (quotes or estimates prior to order conversion), these map to Dolibarr Commercial Proposal objects (propal). Proposal status (open, accepted, rejected) maps to Dolibarr Statut values (0=draft, 1=opened, 2=signed, 3=not signed). The customer reference, line items, pricing, and validity date migrate. Dolibarr allows proposals to be converted to Orders; we note this for the customer's admin to execute post-migration.

Proteus E12ERP

Revenue Center

maps to

Dolibarr ERP

Department (departement)

lossy
Fully supported

An alternative mapping for Proteus E12ERP Revenue Centers where the customer's Dolibarr setup uses the HR module's Department object rather than Projects. We determine the correct target during discovery based on how the customer uses Revenue Centers in Proteus: branch representation maps to Departments, cost-centre accounting maps to Projects. Dolibarr's HR module must be activated for the Department object to be available.

Proteus E12ERP

Custom Field (extrafield)

maps to

Dolibarr ERP

ExtraField (extrafield)

lossy
Fully supported

Any custom fields defined in Proteus E12ERP for standard objects migrate as Dolibarr ExtraFields on the equivalent target object. ExtraFields are defined via Dolibarr's modulebuilder or extrafields interface and require the relevant Dolibarr module to be activated. Custom fields on objects with no Dolibarr equivalent are documented as part of the migration scope and require manual schema creation in Dolibarr before data load. We do not create Dolibarr custom PHP modules as part of the standard migration scope.

Proteus E12ERP

Product Category

maps to

Dolibarr ERP

Category (categorie)

1:1
Fully supported

Product category or classification hierarchies from Proteus E12ERP map to Dolibarr Category records with type=0 (product category). Category assignments on individual products migrate as llx_categories_products links. Dolibarr's Category module must be activated before importing categories.

Proteus E12ERP

Currency and Exchange Rate

maps to

Dolibarr ERP

Multi-currency configuration (multidevise)

lossy
Fully supported

If Proteus E12ERP manages multi-currency vendor or customer records, the currency codes and any stored exchange rates map to Dolibarr's multi-currency accounting configuration. Dolibarr's multi-currency module must be activated. Exchange rates are stored as a reference table in Dolibarr and may require manual update or an external rate provider integration post-migration. This mapping is conditional on Proteus exposing currency fields in its export.

Proteus E12ERP

Attachment and Document Reference

maps to

Dolibarr ERP

Document (document)

1:1
Fully supported

Document references and file attachment paths exported from Proteus E12ERP map to Dolibarr Document records linked to the parent object (ThirdParty, Order, Product, or Project). We preserve the original filename, file type, and upload date. Actual file content (PDFs, images, spreadsheets) migrates as binary data into Dolibarr's documents directory structure. The migration process requires read access to Proteus's document store and write access to Dolibarr's document directory.

Gotchas + challenges

What specifically takes care here

Platform-specific issues from each side, plus the pair-specific challenges that don't show up on either platform's page on its own.

Proteus E12ERP logo

Proteus E12ERP gotchas

High

Multiple Proteus-branded products exist; correct vendor identity must be confirmed

High

Industry-vertical configurations require customization that doesn't always export cleanly

Medium

Inconsistent public pricing across third-party listings

Medium

Limited public API documentation

Dolibarr ERP logo

Dolibarr ERP gotchas

High

Foreign key constraint errors on cross-distribution database restore

High

SQL injection vulnerabilities in version 9.0.1

Medium

Custom fields stored as JSON in extraoptions require field-by-field deserialization

Medium

Decimal precision and rounding configuration affects price fields

Low

No native iOS/Android app forces reliance on browser

Pair-specific challenges

  • Open AP/AR has no documented export path from Proteus E12ERP

    Open invoice state (unpaid customer invoices and outstanding vendor purchase orders) is not documented as an exportable object in the Proteus E12ERP CSV evidence. While the system clearly manages open invoices internally, the export mechanism for open-AP and open-AR records is not explicitly documented. We flag this as a migration gap and recommend customers export open invoice data manually from Proteus reports before cutover. These records then require manual re-entry in Dolibarr's invoice module as draft unpaid invoices. This step cannot be automated without a confirmed export path from Proteus.

  • Dolibarr module activation order must precede any data load

    Dolibarr's modular architecture means that objects do not exist until their module is activated. The ThirdParty object requires the Companies module; the Product object requires the Products or Stock module; Purchase Orders require the Suppliers module; the Chart of Accounts requires the Accounting module. We activate the relevant Dolibarr modules during the configuration step before any data load. Skipping module activation results in silent record rejection or missing fields during import, which can corrupt the target schema if attempted before modules are live.

  • Revenue Centers have no native Dolibarr equivalent

    Proteus E12ERP uses Revenue Centers to represent branches or cost centres in a multi-location setup. Dolibarr has no dedicated cost-centre object in its core ERP module. We map Revenue Centers to Dolibarr Projects with optional cost-centre categorization in the accounting module, but this requires non-standard configuration: the accounting module must be active, and the customer may need to define cost-centre accounts manually. Businesses using Revenue Centers for branch-level financial reporting should validate the Dolibarr cost-accounting configuration with their accountant before production migration.

  • Proteus E12ERP uses a flat relational export structure

    Proteus E12ERP exports data as delimited files from its web interface. The export structure is flat and relational: Customer and Vendor records must load before Sales Orders and Purchase Orders because those order records contain foreign key references. We sequence the export by module to respect this dependency order. Chart-of-accounts data must load before any transactional records. Any out-of-order load attempt results in foreign-key violations that block the import. We audit the Proteus export sequence during discovery and build the load order accordingly.

  • Dolibarr invoice templates and document layout require post-migration configuration

    Dolibarr's default invoice and order PDF templates use a standard layout that reviewers on the Dolibarr forum and Reddit describe as unconventional and limited in customization options compared to ERPNext. We do not migrate custom invoice templates as PDF assets. After migration, the customer's admin should configure Dolibarr's document template settings (Company header, logo, footer, tax ID block) using Dolibarr's built-in document template editor. Custom PDF templates requiring PHP or CSS changes fall outside the standard migration scope and require a Dolibarr developer or partner engagement.

Migration approach

Six steps for a successful Proteus E12ERP to Dolibarr ERP data migration

  1. Discovery and Proteus export audit

    We audit the Proteus E12ERP source environment to identify all exportable modules: Customer records, Vendor records, Inventory Items with stock levels, Sales Orders, Purchase Orders, Revenue Centers, and Chart of Accounts. We verify the format of each delimited export file, check for header consistency, identify null or malformed fields, and confirm which objects have no documented export path (notably open AP/AR). We also identify any custom fields or extended properties on standard objects. The discovery output is a written source audit and a confirmed migration scope with explicit gaps listed.

  2. Dolibarr module activation and base configuration

    Before any data load, we activate the relevant Dolibarr modules in the target instance: ThirdParty module (Companies), Products or Stock module, Commercial module (Orders and Proposals), Suppliers module (Purchase Orders), Projects module (for Revenue Center mapping), and the Accounting module (for Chart of Accounts). We configure the base Dolibarr parameters: company information, fiscal year, currency, warehouse structure (if stock module active), and any required numbering sequences for orders and invoices. This step validates that Dolibarr's target schema is complete before any record-level migration begins.

  3. Test migration in a Dolibarr staging instance

    We run a full migration into a Dolibarr staging instance using production-like data volume extracted from Proteus. The customer's operations lead reviews record counts per object, spot-checks 25-50 records against the Proteus source data, and validates Dolibarr module behavior (order creation, stock updates, third-party linking). Any mapping corrections, data quality issues, or module configuration gaps surface here before production migration. The staging instance remains available as a rollback reference during the production migration window.

  4. Data transformation and load sequencing

    We transform Proteus delimited exports into Dolibarr-compatible CSV files using the confirmed mapping rules. The load order follows Proteus's relational dependencies: Chart of Accounts (first, for accounting integrity), ThirdParty records (Customers and Vendors, for foreign key resolution), Products (with stock values), then transactional records (Sales Orders, Purchase Orders, Proposals). Revenue Centers transform to Projects with the customer choosing between Project-based or Department-based mapping. Each phase emits a row-count reconciliation report before the next phase begins. Open AP/AR is not loaded in this step; we document the manual re-entry procedure for the customer's admin.

  5. Production migration and cutover validation

    We freeze write access to Proteus E12ERP during the cutover window, extract a final delta of any records modified since the initial export, apply those deltas to Dolibarr, and run post-load validation checks: record counts per object, foreign-key integrity (no orphaned order lines or unlinked contacts), stock quantity totals matching the Proteus inventory report, and chart-of-accounts totals reconciling to the Proteus financial report. The customer's admin confirms access to all migrated records in Dolibarr before the Proteus instance is formally decommissioned.

  6. Handoff, open-invoice procedure, and workflow inventory delivery

    We deliver the migration completion report with record counts, known gaps (open AP/AR, custom PDF templates), and the Dolibarr module activation checklist. We provide a written inventory of every Proteus workflow, automation, and custom procedure identified during discovery, mapped to its Dolibarr equivalent (manual process, Dolibarr workflow module, or third-party module). We support a one-week hypercare window to resolve post-migration data issues. We do not provide ongoing admin support, training, or Dolibarr workflow rebuild as standard scope; these are separate engagements.

Platform deep dives

Context on both ends of the pair

Proteus E12ERP logo

Proteus E12ERP

Source

Strengths

  • Mid-market vertical fit for pharma, engineering, food & beverages, chemicals, construction
  • Single integrated platform covering finance, inventory, procurement, production, warehouse, reporting
  • Manufacturing planning with materials, labor, machinery as joint constraints
  • Mobile and AI automation positioning attracts modernization-focused buyers
  • Customizable modules per industry vertical

Weaknesses

  • Smaller vendor footprint than Tier-1 ERPs
  • Inconsistent public pricing data across directories
  • Limited public API and developer ecosystem
  • Regional focus (Ireland/India base) limits multinational deployments
  • Smaller public review/reference footprint
Dolibarr ERP logo

Dolibarr ERP

Destination

Strengths

  • Free core software with AGPL license and no per-user mandatory fee for self-hosted deployments.
  • Modular architecture lets teams activate only needed features, keeping the interface focused and the database lean.
  • Self-hosted option provides full data sovereignty and avoids recurring SaaS subscription costs.
  • Built-in CSV/Excel import and export wizard with saved profiles simplifies recurring data operations.
  • Low-code Module Builder allows functional extensions without writing PHP code.

Weaknesses

  • No native documented REST API for programmatic bulk operations — all migrations depend on the import/export wizard or direct database access.
  • Reporting and analytics are weak without paid add-ons, and built-in charts are limited compared to modern SaaS platforms.
  • UI design is described as dated by multiple reviewers, with infrequent visual updates to the default theme.
  • Community-only support for self-hosted deployments means no SLA or guaranteed response time for issues.
  • Security vulnerabilities (CVE-2024-5314, CVE-2024-5315) in version 9.0.1 with no immediate patch reported.

Complexity grading

How hard is this migration?

Standard ERP migration. 2 of 8 objects need a mapping; the rest are 1:1.

B

Overall complexity

Standard migration

Derived from compatibility, mapping clarity, API constraints, and data volume across Proteus E12ERP and Dolibarr ERP.

  • Object compatibility

    B

    2 of 8 objects need a mapping; the rest are 1:1.

  • Field mapping clarity

    C

    Field mapping is derived from defaults — final spec confirmed during the sample migration.

  • Timeline complexity

    B

    8-object category — typical timelines run 2–7 days end-to-end.

  • API constraints

    B

    Proteus E12ERP: Not publicly documented.

  • Data volume sensitivity

    B

    Proteus E12ERP doesn't expose a bulk API — REST + parallelization used for high-volume runs.

Estimator

Estimate your Proteus E12ERP to Dolibarr ERP migration cost

Rule-based pricing — no per-record fees, no manual quotes. Migrations over 2M records are scoped individually.

Step 1

What are you migrating?

Pick a category, then your source and destination platforms.

Category

FAQ

Frequently asked questions about Proteus E12ERP to Dolibarr ERP data migrations

Answers to the questions buyers ask most during Proteus E12ERP to Dolibarr ERP migration scoping. Not seeing yours? Book a call.

Can't find your answer?

Walk through your Proteus E12ERP to Dolibarr ERP migration with a real engineer — 30 minutes, free, written quote within 24 hours.

Book a free 30 minute consultation

Migrations with under 5,000 Customer records, 3,000 Inventory Items, and no multi-location Revenue Center complexity complete in three to five weeks. Migrations with 10,000+ records, multi-location Revenue Centers, Purchase Orders with open-AP states, or chart-of-accounts configuration requiring accounting module setup move to eight to twelve weeks because of Proteus flat-file sequencing, Dolibarr module activation validation, and manual open-invoice reconciliation. The open-AP/AR gap is the primary timeline variable; if the customer can export those records manually, the migration scope remains fully automated.

Adjacent paths

Related migrations to explore

Ready when you are

Move from Proteus E12ERP.
Land in Dolibarr ERP, intact.

Tell us record counts and timeline. We'll come back with a written quote inside 1 business day — no commitment, no sales pitch.

Accuracy guarantee Rollback included Quote in 1 business day