Project Management migration
Field-level mapping, validation, and rollback between Deltek Project Portfolio Management and monday Work Management. We move data and schema; workflows are rebuilt natively in monday Work Management.
Deltek Project Portfolio Management
Source
monday Work Management
Destination
Compatibility
8 of 12
objects map 1:1 between Deltek Project Portfolio Management and monday Work Management.
Complexity
BStandard
Timeline
5-8 weeks
Overview
Moving from Deltek Project Portfolio Management to monday.com is a structural migration from a purpose-built enterprise PPM platform to a general-purpose work management OS. Deltek stores projects with WBS hierarchies, cost code taxonomies, baseline schedules, and budget curves tied to a DCAA-compliant earned value management model; monday.com represents work as Boards containing Groups of Items organized by custom columns, with no native EVM, cost, or DCAA compliance features. We resolve the WBS-to-Board-Group mapping during scoping, preserve Deltek baselines as a named Item view or column variant, and flag that CPI, SPI, COPQ, and any DCAA audit trail do not migrate because monday.com does not support those data types. Custom cost codes from Deltek (Billing Types, Indirect Cost Codes, WBS Cost Categories) map to monday.com custom columns with explicit value mapping tables rather than relying on auto-match. The portfolio management solution that maps most closely to Deltek's multi-project oversight is only available on monday.com Enterprise, which changes the licensing equation for firms evaluating the switch. We do not migrate Deltek Workflows, Automations, or the Deltek Dela AI assistant; we deliver a written inventory of these for the customer's admin to rebuild in monday.com Automations.
Every standard and custom field arrives verified.
AI proposes the map; you confirm before any record moves.
Parent–child, lookups, and ownership stay linked.
Calls, emails, meetings — with original timestamps.
Documents, uploads, and inline notes move with the record.
Why teams make this switch
Leaving
What's pushing teams away
Choosing
What's pulling them in
Object mapping
Each row shows how a Deltek Project Portfolio Management object lands in monday Work Management, including any object-level transformations, lookup resolution, or schema-design dependencies.
Typical mapping — final map is confirmed during the sample migration step.
Deltek Project Portfolio Management
Project
monday Work Management
Board
1:1Deltek Projects map to monday.com Boards. Each Deltek project name becomes a Board title. Deltek project status (Win, Plan, Execute, Analyze) maps to a Board status column we configure. Project manager assignment maps to a Person column owner on the Board. Deltek's project-level custom fields (billing type, contract type, project classification) map to Board-level custom columns. Note: if the Deltek project contains WBS elements, the WBS becomes a Group hierarchy within the Board (see WBS mapping). The Portfolio solution on monday.com Enterprise then links multiple Boards as a portfolio, which is the nearest equivalent to Deltek's PM Compass cross-project view.
Deltek Project Portfolio Management
Work Breakdown Structure (WBS) Elements
monday Work Management
Groups
1:1Deltek WBS elements map to monday.com Groups within a Board. The numeric WBS identifier (e.g., 1.2.3) maps to a Text column for reference, and the WBS name maps to the Group name. Deltek WBS-level custom fields (e.g., phase, cost category, responsible person) map to Group-level columns. Numeric rollup calculations that Deltek computes automatically (e.g., WBS total hours, WBS total cost) do not have a native monday.com equivalent; we store the computed totals as read-only Number columns and document the calculation formula. For WBS hierarchies deeper than one level, we create nested Groups using monday.com's subitems feature or a dedicated hierarchy column.
Deltek Project Portfolio Management
Baseline (Schedule and Budget)
monday Work Management
Named Item View or Column Snapshot
lossyDeltek stores named schedule baselines and budget baselines as distinct published plan versions. monday.com has no native baseline concept; the current board state is the only stored snapshot. We handle this by creating a dedicated baseline board (separate from the active project board) where we import the published baseline as static Item records with fixed Number columns for planned hours and planned cost per WBS element. During cutover we configure a monday.com named view that the customer can reference alongside the live board. We document which monday.com snapshot or mirror-board strategy the customer prefers. Unpublished plan revisions are not included per Deltek's export behavior.
Deltek Project Portfolio Management
Resource
monday Work Management
People Column + Resource Management
1:1Deltek Resources (employees, consultants, equipment) export via the Planning Data Export CSV with utilization and rate data. We map Deltek Resource IDs to monday.com workspace members and create a People column on the project board. Deltek role rates and billing rates migrate to a Number column on the resource profile. monday.com's Resource Management feature (Work Management and Enterprise tiers) provides a cross-board utilization view that partially replaces Deltek's resource planner. We link each monday.com board to the Resource Management view and map Deltek assignment hours to the Resource Management allocation entries. Note that monday.com Resource Management does not support WBS-level assignment granularity by default; assignments are board-level.
Deltek Project Portfolio Management
Assignment (Task-to-Resource)
monday Work Management
Item + Assignee Column
1:manyDeltek assignments link WBS elements to Resources with hours and dates. We map each Deltek assignment to a monday.com Item within the appropriate Group (mapped from the WBS), with the Assignee set to the mapped monday.com user, and Start Date, Due Date, and Estimated Hours columns populated from the assignment data. Deltek's effort-driven vs. duration-driven scheduling nuance does not transfer; monday.com uses duration-based task tracking by default. We flag this scheduling assumption change for the customer's project manager during scoping.
Deltek Project Portfolio Management
Budget Labor, Expenses, and Consultants
monday Work Management
Number Columns or Budget Column (Enterprise)
lossyDeltek Planning Data Export provides planned labor hours, expense amounts, and consultant costs in separate columns. We chunk these by cost type and map them to monday.com Number columns on the WBS-level Group or Item. If the customer licenses monday.com Work Management Enterprise, we use the Budget column type which supports planned vs. actual comparison at the project level. Deltek's cost code taxonomy (Billing Types, Indirect Cost Codes, WBS Cost Categories) requires an explicit mapping table during scoping because there is no universal mapping from Deltek cost codes to monday.com's standard columns. We validate that budget rollup totals match post-migration to within 0.01% of the Deltek source totals using a reconciliation script.
Deltek Project Portfolio Management
Milestone
monday Work Management
Milestone Column
1:1Deltek milestones export via the Project List Export with dates, names, and deliverables. We map these to monday.com Milestone column values attached to the relevant Group or Item (WBS element). Milestone dates, names, and deliverables migrate directly. Flagged milestone and constraint types (as soon as possible, no later than, etc.) migrate as a Text column for documentation since monday.com's Milestone column is date-only.
Deltek Project Portfolio Management
Risk Register
monday Work Management
Item with Risk Flag and Status Column
1:1Deltek Risk registers export as structured data with risk score, probability, impact, and mitigation plan. monday.com does not have a native Risk object, so we import risks as Items with a Status column filtered to Risk values (High, Medium, Low) and a custom Risk Score Number column. Probability and impact ratings migrate as separate Number columns. Mitigation actions migrate as Subitems on the Risk Item. We add a Risk Flag (checkbox) column to identify these records across the board. This approach allows filtering by risk severity but does not replicate Deltek's dedicated risk dashboard.
Deltek Project Portfolio Management
Custom Fields (User-Defined Data)
monday Work Management
Custom Columns
1:1Deltek User-Defined Data forms export with the Project List Export. We handle text, number, date, and picklist types. Picklist values require an explicit mapping from the Deltek UDA picklist domain to monday.com Dropdown or Status column values. Text UDA values migrate as Text columns. Number UDA values migrate as Number columns. Date UDA values migrate as Date columns. Rich text UDA content (e.g., UDA fields with formatted notes) migrates as a Text column with the raw content. We flag any UDA with more than 20 distinct picklist values because monday.com's Dropdown column has display limits at high cardinality.
Deltek Project Portfolio Management
Documents (via Deltek PIM)
monday Work Management
Files (attached to Board or Items)
1:1Deltek PIM exports documents in a folder structure mirroring the PIM pool. We extract the archive, reconstruct the project-relative folder tree, and attach files to their parent Board or to the relevant Group/Item in monday.com. File metadata (author, created date, modified date) migrates to File column properties where monday.com supports them. Note that monday.com does not support a folder hierarchy; files are listed flatly on the Board or Item. If FileStream was not enabled in Deltek, we extract PIM document URLs and note that file binaries require a separate manual retrieval step before we can attach them.
Deltek Project Portfolio Management
Pipeline Stages (Deltek Project Stages)
monday Work Management
Status Column or Board Grouping
lossyDeltek's four-stage project lifecycle (Win, Plan, Execute, Analyze) maps to a monday.com Status column with these four values, or to Group-level organization if the customer prefers grouping by lifecycle stage. Deltek custom project status values (e.g., On Hold, Closed, Cancelled) map to additional Status values. We configure the Status column during schema setup so that project-level filtering and reporting in monday.com can reference the Deltek project status.
Deltek Project Portfolio Management
Time Entries
monday Work Management
Not Migrated
1:1Time entry capture is handled by Deltek Ajera or Deltek Costpoint in the Deltek ecosystem, not by the standalone PPM tools. Time entries do not live in the Deltek PPM data model and are not available for export via the Planning Data Export. If the customer uses a monday.com-compatible time tracking integration (e.g., Toggl, Clockify, or Harvest), we deliver a mapping table of Deltek labor cost categories to the target time tracking tool for manual setup by the customer's admin. This is not a data migration; it is a configuration guidance deliverable.
| Deltek Project Portfolio Management | monday Work Management | Compatibility | |
|---|---|---|---|
| Project | Board1:1 | Fully supported | |
| Work Breakdown Structure (WBS) Elements | Groups1:1 | Fully supported | |
| Baseline (Schedule and Budget) | Named Item View or Column Snapshotlossy | Fully supported | |
| Resource | People Column + Resource Management1:1 | Fully supported | |
| Assignment (Task-to-Resource) | Item + Assignee Column1:many | Fully supported | |
| Budget Labor, Expenses, and Consultants | Number Columns or Budget Column (Enterprise)lossy | Mapping required | |
| Milestone | Milestone Column1:1 | Fully supported | |
| Risk Register | Item with Risk Flag and Status Column1:1 | Fully supported | |
| Custom Fields (User-Defined Data) | Custom Columns1:1 | Mapping required | |
| Documents (via Deltek PIM) | Files (attached to Board or Items)1:1 | Mapping required | |
| Pipeline Stages (Deltek Project Stages) | Status Column or Board Groupinglossy | Fully supported | |
| Time Entries | Not Migrated1:1 | Not supported |
Gotchas + challenges
Platform-specific issues from each side, plus the pair-specific challenges that don't show up on either platform's page on its own.
Deltek Project Portfolio Management gotchas
Deltek Vantagepoint export must run within a narrow time window
FileStream must be enabled on SQL Server or attachments are excluded from exports
No documented public API with published rate limits
Unpublished plan versions are not exported automatically
Custom cost codes require explicit field-level mapping
monday Work Management gotchas
Subitems have no bulk export endpoint
API complexity budget constrains query depth
Daily call limits vary sharply across plan tiers
Automation and integration rules do not export via API
Saved views are not exposed via API
Pair-specific challenges
Migration approach
Discovery and portfolio sizing
We audit the Deltek PPM instance across project count, WBS depth (levels per project), active resource count, custom field volume (User-Defined Data forms), baseline snapshot count, risk register size, and document volume. We verify SQL Server FileStream status for attachment exports and confirm the Planning Data Export window availability (after business day, before 8:00 PM ET). We pair this with a monday.com tier recommendation: Standard ($9/seat) covers basic boards and groups; Work Management ($16/seat) adds Resource Management and the Budget column; Enterprise ($36/seat) is required for the Portfolio solution if cross-project visibility is needed. The discovery output is a written migration scope with object counts and a monday.com tier recommendation.
Schema design and WBS-to-Board-Group mapping
We design the monday.com schema before any data moves. This includes creating the top-level Board per Deltek Project, configuring Groups to mirror the WBS hierarchy, setting up custom columns for Deltek UDA fields with explicit picklist value mapping, and designing the Status column to reflect Deltek project stages. If the customer requires Enterprise for Portfolio, we provision the Portfolio board structure and link project boards. We also create the baseline shadow board (or snapshot strategy) during this phase. Schema design is validated against a sample of 10-20 Deltek projects to confirm WBS flattening logic before full migration.
Baseline and budget export preparation
Deltek baselines export as part of the Planning Data Export CSV. We instruct the Deltek admin to publish all active baselines before the export date (unpublished revisions are not exported). We validate the CSV row counts against the Deltek project register before initiating monday.com import. Budget data (labor, expenses, consultant costs) is chunked by cost type and validated against Deltek cost rollup totals. We generate the cost code mapping table for any non-standard Deltek cost codes and reconcile final totals to within 0.01% of the Deltek source before marking this phase complete.
Document extraction and attachment preparation
We extract the Deltek PIM archive and reconstruct the project-relative folder tree. We map each file to its parent Board or Group/Item in monday.com. If FileStream was not enabled in Deltek, we document the PIM URLs for manual file retrieval and note this as a separate step in the runbook. Document metadata (author, created date) migrates to monday.com File properties. The customer's admin reviews the extracted document set to confirm nothing is missing before we attach them in monday.com.
Production migration in dependency order
We run production migration in dependency order: Boards (project containers) first, then Groups (WBS elements), then Items (tasks/assignments), then People column assignments, then custom column values, then milestones, then risks, then documents, then baseline shadow boards. Each phase emits a row-count reconciliation report. Budget data (labor, expenses, consultant costs) is imported after resource assignments are confirmed to allow cost rollup validation. Custom field picklist values are loaded before any records referencing them to avoid invalid foreign key errors.
Cutover, validation, and automation rebuild handoff
We freeze Deltek writes during cutover and run a final delta migration of any records modified during the migration window. We validate WBS hierarchy depth, budget rollup totals, milestone dates, and risk register completeness against the Deltek source. We deliver a written inventory of Deltek Workflows and Automations with a monday.com Automations rebuild guide for the customer's admin. We support a one-week hypercare window where we resolve any reconciliation discrepancies. We do not rebuild Deltek automations as monday.com Automations inside the migration scope; that is a separate configuration engagement.
Platform deep dives
Deltek Project Portfolio Management
Source
Strengths
Weaknesses
monday Work Management
Destination
Strengths
Weaknesses
Complexity grading
Standard Project Management migration. 2 of 8 objects need a mapping; the rest are 1:1.
Overall complexity
Standard migration
Derived from compatibility, mapping clarity, API constraints, and data volume across Deltek Project Portfolio Management and monday Work Management.
Object compatibility
2 of 8 objects need a mapping; the rest are 1:1.
Field mapping clarity
Field mapping is derived from defaults — final spec confirmed during the sample migration.
Timeline complexity
8-object category — typical timelines run 2–7 days end-to-end.
API constraints
Deltek Project Portfolio Management: Not publicly documented — typical SaaS limits assumed and confirmed during scoping.
Data volume sensitivity
Deltek Project Portfolio Management doesn't expose a bulk API — REST + parallelization used for high-volume runs.
Estimator
Rule-based pricing — no per-record fees, no manual quotes. Migrations over 2M records are scoped individually.
Step 1
Pick a category, then your source and destination platforms.
Category
FAQ
Answers to the questions buyers ask most during Deltek Project Portfolio Management to monday Work Management migration scoping. Not seeing yours? Book a call.
Walk through your Deltek Project Portfolio Management to monday Work Management migration with a real engineer — 30 minutes, free, written quote within 24 hours.
Book a free 30 minute consultationAdjacent paths
Other ways to leave Deltek Project Portfolio Management
Other ways to arrive at monday Work Management
Same-Project Management migrations
Ready when you are
Tell us record counts and timeline. We'll come back with a written quote inside 1 business day — no commitment, no sales pitch.