Project Management migration

Migrate from Deltek Project Portfolio Management to monday Work Management

Field-level mapping, validation, and rollback between Deltek Project Portfolio Management and monday Work Management. We move data and schema; workflows are rebuilt natively in monday Work Management.

Deltek Project Portfolio Management logo

Deltek Project Portfolio Management

Source

monday Work Management

Destination

monday Work Management logo

Compatibility

67%

8 of 12

objects map 1:1 between Deltek Project Portfolio Management and monday Work Management.

Complexity

BStandard

Timeline

5-8 weeks

Rollback included Accuracy guarantee Field-level validation

Overview

What this migration involves

Moving from Deltek Project Portfolio Management to monday.com is a structural migration from a purpose-built enterprise PPM platform to a general-purpose work management OS. Deltek stores projects with WBS hierarchies, cost code taxonomies, baseline schedules, and budget curves tied to a DCAA-compliant earned value management model; monday.com represents work as Boards containing Groups of Items organized by custom columns, with no native EVM, cost, or DCAA compliance features. We resolve the WBS-to-Board-Group mapping during scoping, preserve Deltek baselines as a named Item view or column variant, and flag that CPI, SPI, COPQ, and any DCAA audit trail do not migrate because monday.com does not support those data types. Custom cost codes from Deltek (Billing Types, Indirect Cost Codes, WBS Cost Categories) map to monday.com custom columns with explicit value mapping tables rather than relying on auto-match. The portfolio management solution that maps most closely to Deltek's multi-project oversight is only available on monday.com Enterprise, which changes the licensing equation for firms evaluating the switch. We do not migrate Deltek Workflows, Automations, or the Deltek Dela AI assistant; we deliver a written inventory of these for the customer's admin to rebuild in monday.com Automations.

Field-level fidelity

Every standard and custom field arrives verified.

Schema-aware mapping

AI proposes the map; you confirm before any record moves.

Relationships preserved

Parent–child, lookups, and ownership stay linked.

Full activity history

Calls, emails, meetings — with original timestamps.

Attachments & notes

Documents, uploads, and inline notes move with the record.

Why teams make this switch

Two sides of the same decision

Leaving

Deltek Project Portfolio Management logo

Deltek Project Portfolio Management

What's pushing teams away

  • Users describe the interface as outdated, clunky, and cumbersome compared to modern SaaS alternatives, with feature-saving layouts and dashboard customization lagging well behind current UX standards.
  • API connectivity with Oracle Primavera P6 is limited or absent, forcing teams to maintain data manually between tools and reducing the value of Deltek PPM as a system of record.
  • Pricing is opaque (no public tiers) and positioned at an enterprise level, making it accessible mainly to mid-to-large firms and pricing smaller A&E or consulting practices out of the platform.
  • The feature set feels dated relative to competitors adding AI-assisted scheduling, real-time collaboration, and modern API-first architectures, causing teams to evaluate newer platforms.
  • G2 reviewers mention difficulty customizing project management workflows within Deltek, suggesting the platform resists adaptation when a firm's processes deviate from Deltek's assumptions.

Choosing

monday Work Management logo

monday Work Management

What's pulling them in

  • Lowest onboarding friction of any mid-market PM tool — drag-and-drop boards and colorful UI mean non-technical team members contribute from day one without training.
  • Highly customizable board structure lets teams model their actual workflow rather than forcing a predefined template onto their process.
  • Generous free forever plan with two seats lets small teams or solo users validate the platform before committing budget or migrating data from elsewhere.
  • Integrations with Slack, Zoom, Google Drive, and CRM tools keep monday.com as a coordination hub rather than requiring teams to switch context constantly.
  • Multiple view modes — Kanban, Calendar, Gantt, Map, Chart — give different team members the visualization they prefer without switching tools.

Object mapping

How Deltek Project Portfolio Management objects map to monday Work Management

Each row shows how a Deltek Project Portfolio Management object lands in monday Work Management, including any object-level transformations, lookup resolution, or schema-design dependencies.

Typical mapping — final map is confirmed during the sample migration step.

Deltek Project Portfolio Management

Project

maps to

monday Work Management

Board

1:1
Fully supported

Deltek Projects map to monday.com Boards. Each Deltek project name becomes a Board title. Deltek project status (Win, Plan, Execute, Analyze) maps to a Board status column we configure. Project manager assignment maps to a Person column owner on the Board. Deltek's project-level custom fields (billing type, contract type, project classification) map to Board-level custom columns. Note: if the Deltek project contains WBS elements, the WBS becomes a Group hierarchy within the Board (see WBS mapping). The Portfolio solution on monday.com Enterprise then links multiple Boards as a portfolio, which is the nearest equivalent to Deltek's PM Compass cross-project view.

Deltek Project Portfolio Management

Work Breakdown Structure (WBS) Elements

maps to

monday Work Management

Groups

1:1
Fully supported

Deltek WBS elements map to monday.com Groups within a Board. The numeric WBS identifier (e.g., 1.2.3) maps to a Text column for reference, and the WBS name maps to the Group name. Deltek WBS-level custom fields (e.g., phase, cost category, responsible person) map to Group-level columns. Numeric rollup calculations that Deltek computes automatically (e.g., WBS total hours, WBS total cost) do not have a native monday.com equivalent; we store the computed totals as read-only Number columns and document the calculation formula. For WBS hierarchies deeper than one level, we create nested Groups using monday.com's subitems feature or a dedicated hierarchy column.

Deltek Project Portfolio Management

Baseline (Schedule and Budget)

maps to

monday Work Management

Named Item View or Column Snapshot

lossy
Fully supported

Deltek stores named schedule baselines and budget baselines as distinct published plan versions. monday.com has no native baseline concept; the current board state is the only stored snapshot. We handle this by creating a dedicated baseline board (separate from the active project board) where we import the published baseline as static Item records with fixed Number columns for planned hours and planned cost per WBS element. During cutover we configure a monday.com named view that the customer can reference alongside the live board. We document which monday.com snapshot or mirror-board strategy the customer prefers. Unpublished plan revisions are not included per Deltek's export behavior.

Deltek Project Portfolio Management

Resource

maps to

monday Work Management

People Column + Resource Management

1:1
Fully supported

Deltek Resources (employees, consultants, equipment) export via the Planning Data Export CSV with utilization and rate data. We map Deltek Resource IDs to monday.com workspace members and create a People column on the project board. Deltek role rates and billing rates migrate to a Number column on the resource profile. monday.com's Resource Management feature (Work Management and Enterprise tiers) provides a cross-board utilization view that partially replaces Deltek's resource planner. We link each monday.com board to the Resource Management view and map Deltek assignment hours to the Resource Management allocation entries. Note that monday.com Resource Management does not support WBS-level assignment granularity by default; assignments are board-level.

Deltek Project Portfolio Management

Assignment (Task-to-Resource)

maps to

monday Work Management

Item + Assignee Column

1:many
Fully supported

Deltek assignments link WBS elements to Resources with hours and dates. We map each Deltek assignment to a monday.com Item within the appropriate Group (mapped from the WBS), with the Assignee set to the mapped monday.com user, and Start Date, Due Date, and Estimated Hours columns populated from the assignment data. Deltek's effort-driven vs. duration-driven scheduling nuance does not transfer; monday.com uses duration-based task tracking by default. We flag this scheduling assumption change for the customer's project manager during scoping.

Deltek Project Portfolio Management

Budget Labor, Expenses, and Consultants

maps to

monday Work Management

Number Columns or Budget Column (Enterprise)

lossy
Mapping required

Deltek Planning Data Export provides planned labor hours, expense amounts, and consultant costs in separate columns. We chunk these by cost type and map them to monday.com Number columns on the WBS-level Group or Item. If the customer licenses monday.com Work Management Enterprise, we use the Budget column type which supports planned vs. actual comparison at the project level. Deltek's cost code taxonomy (Billing Types, Indirect Cost Codes, WBS Cost Categories) requires an explicit mapping table during scoping because there is no universal mapping from Deltek cost codes to monday.com's standard columns. We validate that budget rollup totals match post-migration to within 0.01% of the Deltek source totals using a reconciliation script.

Deltek Project Portfolio Management

Milestone

maps to

monday Work Management

Milestone Column

1:1
Fully supported

Deltek milestones export via the Project List Export with dates, names, and deliverables. We map these to monday.com Milestone column values attached to the relevant Group or Item (WBS element). Milestone dates, names, and deliverables migrate directly. Flagged milestone and constraint types (as soon as possible, no later than, etc.) migrate as a Text column for documentation since monday.com's Milestone column is date-only.

Deltek Project Portfolio Management

Risk Register

maps to

monday Work Management

Item with Risk Flag and Status Column

1:1
Fully supported

Deltek Risk registers export as structured data with risk score, probability, impact, and mitigation plan. monday.com does not have a native Risk object, so we import risks as Items with a Status column filtered to Risk values (High, Medium, Low) and a custom Risk Score Number column. Probability and impact ratings migrate as separate Number columns. Mitigation actions migrate as Subitems on the Risk Item. We add a Risk Flag (checkbox) column to identify these records across the board. This approach allows filtering by risk severity but does not replicate Deltek's dedicated risk dashboard.

Deltek Project Portfolio Management

Custom Fields (User-Defined Data)

maps to

monday Work Management

Custom Columns

1:1
Mapping required

Deltek User-Defined Data forms export with the Project List Export. We handle text, number, date, and picklist types. Picklist values require an explicit mapping from the Deltek UDA picklist domain to monday.com Dropdown or Status column values. Text UDA values migrate as Text columns. Number UDA values migrate as Number columns. Date UDA values migrate as Date columns. Rich text UDA content (e.g., UDA fields with formatted notes) migrates as a Text column with the raw content. We flag any UDA with more than 20 distinct picklist values because monday.com's Dropdown column has display limits at high cardinality.

Deltek Project Portfolio Management

Documents (via Deltek PIM)

maps to

monday Work Management

Files (attached to Board or Items)

1:1
Mapping required

Deltek PIM exports documents in a folder structure mirroring the PIM pool. We extract the archive, reconstruct the project-relative folder tree, and attach files to their parent Board or to the relevant Group/Item in monday.com. File metadata (author, created date, modified date) migrates to File column properties where monday.com supports them. Note that monday.com does not support a folder hierarchy; files are listed flatly on the Board or Item. If FileStream was not enabled in Deltek, we extract PIM document URLs and note that file binaries require a separate manual retrieval step before we can attach them.

Deltek Project Portfolio Management

Pipeline Stages (Deltek Project Stages)

maps to

monday Work Management

Status Column or Board Grouping

lossy
Fully supported

Deltek's four-stage project lifecycle (Win, Plan, Execute, Analyze) maps to a monday.com Status column with these four values, or to Group-level organization if the customer prefers grouping by lifecycle stage. Deltek custom project status values (e.g., On Hold, Closed, Cancelled) map to additional Status values. We configure the Status column during schema setup so that project-level filtering and reporting in monday.com can reference the Deltek project status.

Deltek Project Portfolio Management

Time Entries

maps to

monday Work Management

Not Migrated

1:1
Not supported

Time entry capture is handled by Deltek Ajera or Deltek Costpoint in the Deltek ecosystem, not by the standalone PPM tools. Time entries do not live in the Deltek PPM data model and are not available for export via the Planning Data Export. If the customer uses a monday.com-compatible time tracking integration (e.g., Toggl, Clockify, or Harvest), we deliver a mapping table of Deltek labor cost categories to the target time tracking tool for manual setup by the customer's admin. This is not a data migration; it is a configuration guidance deliverable.

Gotchas + challenges

What specifically takes care here

Platform-specific issues from each side, plus the pair-specific challenges that don't show up on either platform's page on its own.

Deltek Project Portfolio Management logo

Deltek Project Portfolio Management gotchas

High

Deltek Vantagepoint export must run within a narrow time window

High

FileStream must be enabled on SQL Server or attachments are excluded from exports

Medium

No documented public API with published rate limits

Medium

Unpublished plan versions are not exported automatically

Medium

Custom cost codes require explicit field-level mapping

monday Work Management logo

monday Work Management gotchas

High

Subitems have no bulk export endpoint

High

API complexity budget constrains query depth

Medium

Daily call limits vary sharply across plan tiers

Medium

Automation and integration rules do not export via API

Low

Saved views are not exposed via API

Pair-specific challenges

  • monday.com Portfolio management requires Enterprise plan

    Deltek PM Compass dashboards provide cross-project portfolio visibility with risk registers, EVM rollups, and financial summaries. The nearest monday.com equivalent is the Portfolio solution, which links multiple project boards into a single oversight view. monday.com explicitly states in its official tutorial video that the Portfolio solution is only available on the Enterprise plan. Firms migrating to Standard, Basic, or Pro tiers lose the ability to view multiple project boards under a single portfolio umbrella. We flag the Enterprise requirement during scoping so the customer can validate whether the tier cost change affects the total cost of ownership comparison against Deltek.

  • monday.com has no earned value management features

    Deltek PPM's core differentiator for government contractors is built-in earned value management: CPI (Cost Performance Index), SPI (Schedule Performance Index), COPQ (Cost of Poor Quality), and the full suite of EVM metrics required for DCAA-compliant federal reporting. monday.com has no EVM calculation engine, no CPI or SPI column types, and no DCAA audit trail features. Firms that need EVM for active federal contracts cannot use monday.com as a replacement without supplementing with a dedicated EVM tool (Cobra, wInsight, or similar). We document every Deltek EVM field that does not migrate and note that the customer must maintain EVM capability through a separate tool or accept a process change.

  • monday.com Workload view caps at 20-50 linked boards

    Agencies managing large active project portfolios (80+ concurrent projects, as described in a Reddit implementation thread) rely on Deltek's portfolio-wide resource allocation view. monday.com's Workload view supports a maximum of 20 linked boards on standard plans and 50 on Enterprise, which falls short for large A&E or professional services firms. We check the portfolio size during scoping. If the firm exceeds the board linkage limit, we recommend a tier upgrade to Enterprise or a hybrid approach where monday.com manages active project execution and a separate reporting tool (Smartsheet, Power BI, or the monday.com dashboard) handles cross-portfolio resource analysis.

  • monday.com lacks DCAA compliance features

    Deltek PPM is DCAA-compliant with built-in audit trails, time-tracking controls, and indirect cost rate management designed for government contractors. monday.com is a general-purpose work management platform and does not implement DCAA compliance controls, indirect cost rate structures, or compliant time-tracking features. Firms migrating away from Deltek specifically for DCAA compliance reasons should verify that their compliance requirements can be met through monday.com configurations and third-party add-ons before committing to migration. We do not migrate DCAA-specific configuration data because monday.com does not have a schema for it.

  • monday.com lacks native cost code and billing type taxonomy

    Deltek supports deeply customized cost code taxonomies (Billing Types, Indirect Cost Codes, WBS Cost Categories) that vary firm by firm and encode the firm's billing logic directly into the project data model. monday.com has no native cost code or billing type concept. We map Deltek cost codes to monday.com custom columns and create explicit value mapping tables during scoping, but monday.com does not enforce cost code validity, compute indirect cost rate applications, or produce the financial rollup reports that Deltek cost code taxonomies support. The customer must decide whether to use monday.com's numeric columns for cost tracking or externalize billing logic to an ERP integration.

Migration approach

Six steps for a successful Deltek Project Portfolio Management to monday Work Management data migration

  1. Discovery and portfolio sizing

    We audit the Deltek PPM instance across project count, WBS depth (levels per project), active resource count, custom field volume (User-Defined Data forms), baseline snapshot count, risk register size, and document volume. We verify SQL Server FileStream status for attachment exports and confirm the Planning Data Export window availability (after business day, before 8:00 PM ET). We pair this with a monday.com tier recommendation: Standard ($9/seat) covers basic boards and groups; Work Management ($16/seat) adds Resource Management and the Budget column; Enterprise ($36/seat) is required for the Portfolio solution if cross-project visibility is needed. The discovery output is a written migration scope with object counts and a monday.com tier recommendation.

  2. Schema design and WBS-to-Board-Group mapping

    We design the monday.com schema before any data moves. This includes creating the top-level Board per Deltek Project, configuring Groups to mirror the WBS hierarchy, setting up custom columns for Deltek UDA fields with explicit picklist value mapping, and designing the Status column to reflect Deltek project stages. If the customer requires Enterprise for Portfolio, we provision the Portfolio board structure and link project boards. We also create the baseline shadow board (or snapshot strategy) during this phase. Schema design is validated against a sample of 10-20 Deltek projects to confirm WBS flattening logic before full migration.

  3. Baseline and budget export preparation

    Deltek baselines export as part of the Planning Data Export CSV. We instruct the Deltek admin to publish all active baselines before the export date (unpublished revisions are not exported). We validate the CSV row counts against the Deltek project register before initiating monday.com import. Budget data (labor, expenses, consultant costs) is chunked by cost type and validated against Deltek cost rollup totals. We generate the cost code mapping table for any non-standard Deltek cost codes and reconcile final totals to within 0.01% of the Deltek source before marking this phase complete.

  4. Document extraction and attachment preparation

    We extract the Deltek PIM archive and reconstruct the project-relative folder tree. We map each file to its parent Board or Group/Item in monday.com. If FileStream was not enabled in Deltek, we document the PIM URLs for manual file retrieval and note this as a separate step in the runbook. Document metadata (author, created date) migrates to monday.com File properties. The customer's admin reviews the extracted document set to confirm nothing is missing before we attach them in monday.com.

  5. Production migration in dependency order

    We run production migration in dependency order: Boards (project containers) first, then Groups (WBS elements), then Items (tasks/assignments), then People column assignments, then custom column values, then milestones, then risks, then documents, then baseline shadow boards. Each phase emits a row-count reconciliation report. Budget data (labor, expenses, consultant costs) is imported after resource assignments are confirmed to allow cost rollup validation. Custom field picklist values are loaded before any records referencing them to avoid invalid foreign key errors.

  6. Cutover, validation, and automation rebuild handoff

    We freeze Deltek writes during cutover and run a final delta migration of any records modified during the migration window. We validate WBS hierarchy depth, budget rollup totals, milestone dates, and risk register completeness against the Deltek source. We deliver a written inventory of Deltek Workflows and Automations with a monday.com Automations rebuild guide for the customer's admin. We support a one-week hypercare window where we resolve any reconciliation discrepancies. We do not rebuild Deltek automations as monday.com Automations inside the migration scope; that is a separate configuration engagement.

Platform deep dives

Context on both ends of the pair

Deltek Project Portfolio Management logo

Deltek Project Portfolio Management

Source

Strengths

  • Robust earned value management with CPI, COPQ, and SPI for government contractor compliance and federal reporting requirements.
  • Configurable workflows with custom fields and User-Defined Data forms for firm-specific project management processes.
  • Portfolio-level visibility across multiple projects via PM Compass dashboards and cross-project risk registers.
  • SQL Server-backed data export via Planning Data Export CSV for integration with BI and reporting tools.
  • Multi-decade market presence with deep vertical expertise in A&E, government contracting, and consulting.

Weaknesses

  • No publicly documented public API with published rate limits; exports rely on CSV/Excel and SQL Server FileStream rather than a modern REST or GraphQL interface.
  • Interface and feature set widely described as outdated compared to modern cloud-native project management tools.
  • No native integration path with Oracle Primavera P6 via API, forcing manual data sync for firms running both tools.
  • Pricing is opaque and enterprise-tier only, with no self-serve or free trial available.
  • Customization is limited and difficult; G2 reviews cite frustration with customizing project management workflows within Deltek.
monday Work Management logo

monday Work Management

Destination

Strengths

  • Drag-and-drop board UI with near-zero learning curve for non-technical users entering project data for the first time.
  • 20+ column types and unlimited custom columns let teams model arbitrarily complex data structures without developer help.
  • Multi-view support — Kanban, Gantt, Calendar, Timeline, Chart, Map — satisfies different team members without forcing a single layout.
  • Automations cover common trigger-action patterns for teams without dedicated developers to write custom scripts.
  • Free plan for 2 seats and a 14-day trial on all paid tiers make evaluation risk-free before committing to migration scope.

Weaknesses

  • Per-seat pricing with no enterprise flat-rate option means costs scale linearly with headcount, making it expensive at 50+ seats.
  • Subitems lack bulk API access, making them problematic for CRM-style use cases where contact records live as subitems under a company board.
  • Automations and advanced views are gated behind Pro and Enterprise tiers, creating feature deserts on entry-level plans.
  • Dependency column is visually limited — no critical path, no auto-rescheduling, and cross-board dependencies require manual link management.
  • No native document management; docs, wikis, and knowledge bases require a separate integration or third-party workaround.

Complexity grading

How hard is this migration?

Standard Project Management migration. 2 of 8 objects need a mapping; the rest are 1:1.

B

Overall complexity

Standard migration

Derived from compatibility, mapping clarity, API constraints, and data volume across Deltek Project Portfolio Management and monday Work Management.

  • Object compatibility

    B

    2 of 8 objects need a mapping; the rest are 1:1.

  • Field mapping clarity

    C

    Field mapping is derived from defaults — final spec confirmed during the sample migration.

  • Timeline complexity

    B

    8-object category — typical timelines run 2–7 days end-to-end.

  • API constraints

    B

    Deltek Project Portfolio Management: Not publicly documented — typical SaaS limits assumed and confirmed during scoping.

  • Data volume sensitivity

    B

    Deltek Project Portfolio Management doesn't expose a bulk API — REST + parallelization used for high-volume runs.

Estimator

Estimate your Deltek Project Portfolio Management to monday Work Management migration cost

Rule-based pricing — no per-record fees, no manual quotes. Migrations over 2M records are scoped individually.

Step 1

What are you migrating?

Pick a category, then your source and destination platforms.

Category

FAQ

Frequently asked questions about Deltek Project Portfolio Management to monday Work Management data migrations

Answers to the questions buyers ask most during Deltek Project Portfolio Management to monday Work Management migration scoping. Not seeing yours? Book a call.

Can't find your answer?

Walk through your Deltek Project Portfolio Management to monday Work Management migration with a real engineer — 30 minutes, free, written quote within 24 hours.

Book a free 30 minute consultation

Most migrations land between five and eight weeks for portfolios under 200 projects with no EVM requirements and standard custom fields. Migrations with large WBS depth (5+ levels), custom cost code taxonomies requiring explicit mapping tables, multi-entity structures, or 50+ published baseline snapshots move to twelve to twenty weeks because of WBS hierarchy design time, budget reconciliation, and document extraction scope. monday.com does not charge onboarding fees, so the migration timeline is purely the data transfer and configuration work.

Adjacent paths

Related migrations to explore

Ready when you are

Move from Deltek Project Portfolio Management.
Land in monday Work Management, intact.

Tell us record counts and timeline. We'll come back with a written quote inside 1 business day — no commitment, no sales pitch.

Accuracy guarantee Rollback included Quote in 1 business day