ERP migration
Field-level mapping, validation, and rollback between ManEx and Infor CloudSuite Corporate. We move data and schema; workflows are rebuilt natively in Infor CloudSuite Corporate.
ManEx
Source
Infor CloudSuite Corporate
Destination
Compatibility
10 of 12
objects map 1:1 between ManEx and Infor CloudSuite Corporate.
Complexity
BStandard
Timeline
6-10 weeks
Overview
Moving from ManEx ERP to Infor CloudSuite Industrial is an on-premise-to-cloud migration that begins with direct database extraction since ManEx provides no documented API. We map Customer, Vendor, PO, SO, BOM, Shop Floor, and Inventory records into Infor CloudSuite Industrial's schema using the platform's built-in Migration Utility, which requires strict sequencing because parent entities must exist before child records load. Multi-level BOMs with phantom assemblies require decomposition during staging, and the quoting module's known limitations in ManEx mean we flag quote data with a quality disclaimer rather than silently propagating incomplete pricing into the target. Workflows, alerts, and custom Stimulsoft reports do not migrate; we deliver a written inventory of these for the customer's Infor administrator to rebuild in Infor OS.
Every standard and custom field arrives verified.
AI proposes the map; you confirm before any record moves.
Parent–child, lookups, and ownership stay linked.
Calls, emails, meetings — with original timestamps.
Documents, uploads, and inline notes move with the record.
Source platform
ManEx platform overview
Scorecard, SWOT, gotchas, and pricing for ManEx.
Destination platform
Infor CloudSuite Corporate platform overview
Scorecard, SWOT, gotchas, and pricing for Infor CloudSuite Corporate.
Data migration guide
The complete Infor CloudSuite migration guide
Data model, import mechanisms, field mapping strategy, pitfalls, and cutover — by the engineers running it.
Destination checklist
Infor CloudSuite migration checklist
Pre- and post-cutover tasks for moving onto Infor CloudSuite Corporate.
Why teams make this switch
Leaving
What's pushing teams away
Choosing
What's pulling them in
Object mapping
Each row shows how a ManEx object lands in Infor CloudSuite Corporate, including any object-level transformations, lookup resolution, or schema-design dependencies.
Typical mapping — final map is confirmed during the sample migration step.
ManEx
Customer
Infor CloudSuite Corporate
Customer
1:1ManEx Customer records (contact details, account assignments, address data, payment terms) map to Infor CloudSuite Industrial Customer Master. We extract via direct SQL query on the ManEx database or flat-file export, clean address fields to match Infor's address structure, and resolve the Customer's currency and tax jurisdiction codes to Infor equivalents. Customer is loaded before any Sales Order or AR data because of foreign-key dependencies in the Infor Migration Utility sequence.
ManEx
Vendor
Infor CloudSuite Corporate
Supplier
1:1ManEx Vendor master data with PO history and RMA associations maps to Infor CloudSuite Industrial Supplier. The vendor-supplier relationship is preserved as a distinct entity to avoid merging suppliers with customers, which are separate objects in Infor. We map ManEx vendor codes to Infor Supplier numbers and preserve any vendor-specific payment terms or RMA contact information as Supplier notes.
ManEx
Chart of Accounts
Infor CloudSuite Corporate
GL Account
1:1ManEx GL accounts (asset, liability, equity, revenue, expense types) map to Infor CloudSuite Industrial GL Account Master. We map each account code and type to the destination chart of accounts, flagging any inactive or suspended ManEx accounts for the customer's Infor administrator to activate post-migration. Account code length and hierarchy must be validated against Infor's account structure before import.
ManEx
Purchase Order
Infor CloudSuite Corporate
Purchase Order
1:1ManEx PO records (line items tied to BOMs, vendor assignments, receiving status) map to Infor CloudSuite Industrial Purchase Order. We preserve the full PO lifecycle including partially received orders, mapping ManEx receiving status flags to Infor PO receipt status. PO header must be loaded before PO lines due to header-level foreign keys in the Infor Migration Utility.
ManEx
Sales Order
Infor CloudSuite Corporate
Sales Order
1:1ManEx Sales Order records (pricing, customer linkage, fulfillment status, multi-price-list assignments) map to Infor CloudSuite Industrial Sales Order. Multi-price-list pricing requires value-mapping because ManEx price list IDs are not portable across ERP systems; we resolve the active price list at migration time and map it to Infor's price book structure. SO header is loaded before line items and before any related Invoice records.
ManEx
Bill of Materials
Infor CloudSuite Corporate
BOM / Formula
1:manyManEx multi-level BOM structures map to Infor CloudSuite Industrial BOM with routing data. Complex multi-level BOMs with phantom assemblies require decomposition during staging: we flatten single-level BOMs for import and document the original hierarchy so the customer's Infor administrator can rebuild parent-level BOMs post-migration if routing continuity is required. Component quantities, scrap factors, and work center assignments are mapped to Infor's BOM lines and routing operations.
ManEx
Shop Floor Transaction
Infor CloudSuite Corporate
Work Order Transaction
1:1ManEx real-time shop floor data (labor time, machine cycles, material consumption per work order) maps to Infor CloudSuite Industrial Work Order transactions. Timestamps are preserved to maintain production history continuity, and material consumption records are linked to the corresponding Infor inventory transactions. Shop floor transactions reference Work Order numbers that must exist in Infor before the transaction import phase begins.
ManEx
Inventory Record
Infor CloudSuite Corporate
Inventory Item
1:1ManEx inventory quantities, locations, lot/serial data, and on-hand quantities map to Infor CloudSuite Industrial Inventory. We handle multiple warehouse locations, lot traceability, and serial number records, mapping ManEx warehouse codes to Infor site and subinventory codes. On-hand quantities are loaded after the Item Master is populated to satisfy foreign-key requirements.
ManEx
AP/AR Ledger Entry
Infor CloudSuite Corporate
AP/AR Transaction
1:1Open payables and receivables map to Infor CloudSuite Industrial AP and AR transactions with current status, aging buckets, and payment terms. Historical ledger transactions require special handling because ManEx may store them in archived or compressed tables; we extract as many periods as the customer elects to migrate and flag any gaps. Open items are loaded before closed items to maintain aging accuracy.
ManEx
RMA Record
Infor CloudSuite Corporate
Return Material Authorization
1:1ManEx RMA records tied to original SOs or POs map to Infor CloudSuite Industrial RMA. RMA status codes (open, in-progress, closed) require explicit value-mapping because the state machine differs between ManEx and Infor. We preserve the link to the originating PO or SO as a reference field so the customer's returns team can trace the original transaction in Infor.
ManEx
Time and Attendance Record
Infor CloudSuite Corporate
Time Transaction
1:1ManEx Time and Attendance entries from the optional module tie to employees and work orders. If the destination Infor CloudSuite environment includes Infor HCM or a separate timekeeping module, we map time entries to the corresponding employee records and flag any labor classification codes requiring Infor work class setup. If no Infor time module is present, we export time data as a flat file for the customer's HR administrator to reconcile.
ManEx
Quote Record
Infor CloudSuite Corporate
Quote
lossyManEx Quote records with known BOM pricing limitations are migrated with a quality flag. The ManEx quoting module's failure on complex multi-level BOM pricing means a subset of quote records may contain incorrect or incomplete pricing. We migrate quotes as-is with a flag noting its known limitation and recommend the customer's Infor administrator review high-value quotes before using them as templates or converting them to Sales Orders.
| ManEx | Infor CloudSuite Corporate | Compatibility | |
|---|---|---|---|
| Customer | Customer1:1 | Fully supported | |
| Vendor | Supplier1:1 | Fully supported | |
| Chart of Accounts | GL Account1:1 | Fully supported | |
| Purchase Order | Purchase Order1:1 | Fully supported | |
| Sales Order | Sales Order1:1 | Fully supported | |
| Bill of Materials | BOM / Formula1:many | Fully supported | |
| Shop Floor Transaction | Work Order Transaction1:1 | Fully supported | |
| Inventory Record | Inventory Item1:1 | Fully supported | |
| AP/AR Ledger Entry | AP/AR Transaction1:1 | Fully supported | |
| RMA Record | Return Material Authorization1:1 | Fully supported | |
| Time and Attendance Record | Time Transaction1:1 | Fully supported | |
| Quote Record | Quotelossy | Fully supported |
Gotchas + challenges
Platform-specific issues from each side, plus the pair-specific challenges that don't show up on either platform's page on its own.
ManEx gotchas
No public API forces direct database exports
On-premise backup responsibility is the customer’s
Cube successor product remains in extended beta
Quoting module fails for complex manufacturing BOMs
Stimulsoft reporting has rendering limitations
Infor CloudSuite Corporate gotchas
Infor OS tier-based usage limits gate API and BaaS capabilities
Custom Fields use inconsistent naming across Infor editions
SQL migration utility requires source database access
Multi-site and multi-currency data require separate period closure sequencing
REST API payload and timeout limits restrict bulk migration throughput
Pair-specific challenges
Migration approach
Discovery and database access negotiation
We audit the source ManEx instance to identify which optional modules (Project Management, Repair, Time and Attendance) are active, the schema of the underlying SQL database, and the scope of transactional history to migrate. We negotiate explicit read-only database access credentials with the customer and validate connectivity from our migration environment. We produce a written migration scope document listing every object, record count estimate, BOM complexity assessment, and a preliminary import sequence based on Infor CloudSuite Industrial's dependency rules.
Staging database setup and BOM decomposition
We set up a staging database that mirrors Infor's migration database structure. We extract ManEx data via direct SQL queries into staging tables with schema names aligned to Infor's table naming convention. Multi-level BOMs with phantom assemblies are decomposed into single-level component records during this phase, with the original hierarchy preserved as a separate reference table for the customer's Infor administrator. We run data quality checks against the staging data and flag any incomplete or inconsistent records before building the import mapping.
Infor Migration Utility sequence configuration
We configure Infor CloudSuite Industrial's Migration Utility with source-to-target table mappings for every object in scope. We use Infor's predefined stored procedures where they match ManEx table structures and create custom stored procedures for any non-standard mappings. We define import rules for data type conversions (date formats, decimal precision, flag values) and set the import sequence in the Import Steps form, testing each sequence via Preliminary Data Transfer before committing. Any mapping corrections are logged and the sequence is re-validated.
Sandbox migration and reconciliation
We run a full migration into a staging Infor CloudSuite environment (or the customer's Sandbox if available) using production-like data volume. The customer's operations team reconciles record counts across every object, spot-checks 25-50 records against the ManEx source, and validates that BOM structures, open PO and SO statuses, and inventory quantities match expectations. We correct any mapping errors identified during reconciliation before scheduling the production migration window.
Production migration in dependency order
We execute the production migration in the validated sequence: GL Accounts first, then Customers and Suppliers, then Items and Inventory, then BOMs with decomposition notes, then Purchase Orders and Sales Orders, then Work Orders and Shop Floor Transactions, then AP/AR ledgers, then RMA records, then Time and Attendance if applicable. Each phase emits a row-count reconciliation report before the next phase begins. Delta migrations capture any records created or modified during the production migration window.
Cutover, validation, and report inventory handoff
We freeze ManEx writes during cutover, run a final delta migration, and enable Infor CloudSuite as the system of record. We deliver the Report Inventory document listing every active ManEx Stimulsoft report with its data source tables and recommended Infor OS rebuild approach. We support a one-week hypercare window to resolve reconciliation issues raised by the customer's operations team. We do not rebuild ManEx workflows, alerts, or reports inside the migration scope; these are documented for the customer's Infor administrator to rebuild in Infor OS post-migration.
Platform deep dives
ManEx
Source
Strengths
Weaknesses
Infor CloudSuite Corporate
Destination
Strengths
Weaknesses
Complexity grading
Standard ERP migration. 1 of 8 objects need a mapping; the rest are 1:1.
Overall complexity
Standard migration
Derived from compatibility, mapping clarity, API constraints, and data volume across ManEx and Infor CloudSuite Corporate.
Object compatibility
1 of 8 objects need a mapping; the rest are 1:1.
Field mapping clarity
Field mapping is derived from defaults — final spec confirmed during the sample migration.
Timeline complexity
8-object category — typical timelines run 2–7 days end-to-end.
API constraints
ManEx: Not publicly documented.
Data volume sensitivity
ManEx doesn't expose a bulk API — REST + parallelization used for high-volume runs.
Estimator
Rule-based pricing — no per-record fees, no manual quotes. Migrations over 2M records are scoped individually.
Step 1
Pick a category, then your source and destination platforms.
Category
FAQ
Answers to the questions buyers ask most during ManEx to Infor CloudSuite Corporate migration scoping. Not seeing yours? Book a call.
Walk through your ManEx to Infor CloudSuite Corporate migration with a real engineer — 30 minutes, free, written quote within 24 hours.
Book a free 30 minute consultationAdjacent paths
Other ways to leave ManEx
Other ways to arrive at Infor CloudSuite Corporate
Ready when you are
Tell us record counts and timeline. We'll come back with a written quote inside 1 business day — no commitment, no sales pitch.