Wrike to Jira migration

We migrate Projects, Tasks, Subtasks, Custom Fields, Time Entries, and historical attachment references from Wrike into Jira with the status-mapping matrix built before any data moves, the subtask hierarchy preserved, and Wrike Spaces permissions flagged for manual rebuild in Jira's permission schemes.

Short answer

FlitStack AI migrates project group or projects, project or project components, projects, issues and sub-task issues from Wrike to Jira, with their history and the associations between records. Every field is mapped and validated, a sample run is checked with you before the full migration, and the whole move can be rolled back in one click. Typical timeline: 3-5 weeks.

By

Source Wrike
DestinationJira
Project Group or ProjectProject or Project componentProjectIssueSub-Task Issue
Mapped field by field · sample run · one-click rollback

What moves from Wrike to Jira?

Moving from Wrike to Jira is a cross-model migration that reshapes how work is organized and tracked.

Read the full summary

Wrike uses a flat-to-hierarchical folder-and-project model with flexible status sets and 14+ custom field types; Jira uses a Project-plus-Issue-Type structure with configurable workflows, status categories, and custom fields scoped per project. We map Wrike Folders and Projects to Jira Projects, Tasks to Issues with the correct Issue Type and Workflow Status, and Subtasks to Jira Subtasks or child Issues depending on the destination project configuration. Wrike Spaces carry their own permission model that Jira permission schemes do not replicate directly—we flag every Space access group for manual configuration after migration. Wrike Workflows, Automations, and Dashboard widgets are not migrated as code; we deliver a written inventory of every active automation and its Jira Automation or rule-based equivalent so the customer's admin can rebuild them post-cutover.

lookup

Space → Project Group or Project

Wrike Spaces are top-level organizational containers that group Folders and define access boundaries.

How it maps

Jira does not have an equivalent Space object. We map Space assignments to Jira Projects grouped by a naming convention (e.g., [Space Name] prefix on Project key), and we document every Space-to-permission-group mapping for the customer's admin to rebuild in Jira's permission schemes and project roles. This is a manual rebuild step—not automated during migration.

1:N split

Folder → Project or Project component

Wrike Folders sit above Projects in the hierarchy and can contain sub-Folders or Projects.

How it maps

Jira has no Folder equivalent. We evaluate the Folder depth: single-level Folders map to Jira Projects; nested Folders are flattened and mapped to Jira Project keys with a descriptive naming convention that preserves the original hierarchy path in the Project description field.

1:1

Project → Project

Wrike Projects map 1:1 to Jira Projects using the project title, description, start and due dates, status, and custom field values.

How it maps

We preserve the Wrike project key in the Jira Project description for traceability. The Jira Project must be created and configured (Issue Types, Workflow, field layout) before any Issues are imported.

1:1

Task → Issue (Story, Task, Bug)

Wrike Tasks are the primary work unit and map to Jira Issues with the Issue Type selected during scoping based on task content analysis (bug reports become Bugs; deliverables become Stories; administrative work becomes Tasks).

How it maps

Assignee, reporter, priority, due date, and custom field values migrate directly. The Jira Issue Type schema must be configured per project before import.

1:1

Subtask → Sub-Task Issue

Wrike Subtasks inherit the parent Task's context and can carry independent assignees and dates.

How it maps

Jira Sub-Tasks are typed as Sub-Task Issue Type and linked to a parent Issue. We preserve the parent-child hierarchy explicitly so nesting depth is maintained. The Sub-Task Issue Type must be enabled in the destination project's Issue Type scheme.

mapping

Custom Field → Custom Field

Wrike supports 14+ custom field types (DropDown, Numeric, Date, Currency, Percentage, Contacts, Checkbox, Calculated).

How it maps

We map these to equivalent Jira custom fields by type: DropDown to Select List, Numeric to Number, Date to Date Picker, Currency to Number or Currency (Jira does not have a native Currency field on Standard). Calculated fields from Wrike are exported as static values at migration time and flagged for the admin to recreate as Jiracalculated field apps or manual static values post-migration.

What moves10 objects
WrikeJira
  • SpaceProject Group or Projecttransformed
  • FolderProject or Project componentsplit
  • ProjectProject1:1
  • TaskIssue1:1
  • SubtaskSub-Task Issue1:1
  • Custom FieldCustom Fieldtransformed

+ 4 more in the mapping below

How Wrike and Jira differ

The differences that decide how each record is mapped. These are what a CSV export and a native importer don't resolve for you.

DimensionWrikeJira
Workflow modelCustomizable global or per-project status sets with transition rulesProject-scoped Workflows with Status Categories (To Do, In Progress, Done)
Project hierarchySpaces > Folders > Projects > Tasks > SubtasksProjects > Issues (with Epic, Story, Task, Bug types)
Time trackingNative time logs with billing categories on Business plan and aboveRequires Tempo or Clockwork app; not native on standard plans
Interface complexityIntuitive setup, minimal learning curve for non-technical usersSteeper learning curve, complex project configuration requiring admin or developer input
Permission modelSpace-level and folder-level access groupsProject-level permission schemes and issue-level security
Integration ecosystem400+ native integrations including Salesforce, Adobe Creative Cloud, Google WorkspaceAtlassian ecosystem (Confluence, Bitbucket, GitHub, GitLab) with Marketplace apps

What to watch for in a Wrike to Jira migration

The issues we plan around on this pair: limits and data-model gaps that the official import tools leave to you.

high

CSV export silently drops comments and attachments

Teams using Wrike's native CSV export to Jira report losing all task comments and attachment references—the CSV format does not include them.

How we handle it

FlitStack AI extracts comments via the Wrike API and re-attaches them to the corresponding Jira Issues after issue creation. Attachment URLs are preserved and relinked. Without API-based extraction, comments and attachments are permanently lost during migration.

medium

Calculated Custom Fields become static values in Jira

Wrike CalculatedNumeric and CalculatedDate fields store computed values at import time, not live formulas.

How we handle it

Jira has no native calculated field feature without a Marketplace app. We export the last known calculated value as a static Jira custom field value and flag every Calculated field in the migration log with a recommendation to recreate the formula in Jira using apps like ScriptRunner or to accept the static value.

medium

Wrike Spaces permission model has no direct Jira equivalent

Wrike Spaces define access groups and permissions at the top organizational level.

How we handle it

Jira's permission model operates at the project and issue level via permission schemes and issue security levels. We export Space membership and deliver a written Space-to-permission-group mapping table for the customer's Jira admin to configure as project roles and permission schemes post-migration. This is a manual step that cannot be automated across the two different permission architectures.

medium

Wrike Workflow statuses require manual Jira workflow configuration

Wrike custom statuses and transition rules do not map automatically to Jira because Jira Workflows use Status Categories that constrain which statuses appear in which board columns.

How we handle it

A Wrike status called Review does not automatically land in the To Do or Done column. We deliver a status mapping matrix and a written Workflow configuration guide; the customer's Jira admin implements the Jira Workflow with the correct Status Categories and transition rules before or after migration.

How the migration runs

  1. Workspace audit and Jira project schema design

    We audit the Wrike workspace across Spaces, Folders, Projects, active Workflows, custom field inventory (including Calculated field count), time entry volume, and user count.

    What this step covers

    We pair this with a Jira project design session: which Wrike Projects map to which Jira Projects, which Issue Type scheme each project uses, and whether Sub-Task Issue Type is enabled. The audit output is a written migration scope with a Jira project schema diagram and an automation inventory spreadsheet.

  2. Status mapping matrix and Jira Workflow configuration guide

    We extract every Wrike Workflow definition including all custom statuses and transition rules.

    What this step covers

    We build a Jira Status Category mapping matrix that assigns each Wrike status to a Jira status in To Do, In Progress, or Done. We deliver a written Jira Workflow configuration guide that the customer's admin implements in their Jira site before migration begins. Workflow configuration is a prerequisite for Issue import because Jira validates status values against the project Workflow on every record insert.

  3. User provisioning and owner reconciliation

    We extract every Wrike user referenced on Tasks, Projects, and Time Entries and match by email against the destination Jira site's User directory.

    What this step covers

    Users without a matching Jira account go to a provisioning queue. Jira site admins must provision all required users (active or inactive depending on whether the original Wrike user remains active) before the issue import phase begins, because Jira requires a valid AssigneeId on every Issue record.

  4. Sandbox migration and mapping validation

    We run a full migration into a Jira Sandbox or a non-production Jira project using representative data volume.

    What this step covers

    The customer's project manager or Jira admin spot-checks 25-50 issues for data accuracy: correct Issue Type, correct Status mapping, correct custom field values, correct assignee, and correct attachment links. We correct any mapping errors before production migration begins.

  5. Production migration in dependency order

    We run production migration in record-dependency order: Jira Projects and Issue Type schemes (configured before import), Custom Fields (created in Jira before record import), Issues (Tasks and Subtasks in parent-child order), Time Entries (via native worklog or Tempo API post-Tempo install), Comments (extracted from Wrike API and attached to Jira Issues), and Attachment URL re-linking.

    What this step covers

    Each phase emits a row-count reconciliation report before the next phase begins.

  6. Cutover, delta sync, and automation rebuild handoff

    We freeze Wrike writes during cutover, run a final delta migration of any records modified during the migration window, then enable Jira as the system of record.

    What this step covers

    We deliver the Wrike Automation and Dashboard widget inventory with a written recommendation for Jira Automation or Atlassian Marketplace equivalents. We do not rebuild Wrike Automations as Jira Automation rules or Wrike Dashboard widgets as Jira gadgets; that is a separate scope or an internal admin task.

Wrike Jira
  1. Connect
  2. Map
  3. Sample
  4. Migrate
  5. Verify
  • Contacts48,210 / 48,210 Done
  • Companies9,134 / 9,134 Done
  • Deals6,377 / 11,920 In progress
Example run
Restore points · JiraRollback ready
  1. Before sample runRestore point 01Restore
  2. Before full migrationRestore point 02Restore
  3. After verificationRestore point 03Current
Example

How long it takes, and what drives the quote

3-5 weeksTypical, smaller accounts
8-14 weeksLarge or heavily customised accounts

A quote scales with workspace complexity, active user count, and attachment volume. Every quote is scoped with you; there is no self-serve pricing.

Get a quote for Wrike to Jira →

Why teams move from Wrike to Jira

  • Wrike's per-seat pricing enforces hard minimums—a team needing two Business-plan seats must reportedly purchase five, adding approximately $900/year in phantom costs. Jira Software Standard at $7.42/user/month is per-seat without tier-range minimums, making it more cost-predictable for teams that want resource management and workflow automation without the forced over-purchase.
  • As workspaces scale, Wrike's accumulated projects, automations, and custom fields degrade interface performance and increase onboarding friction. Reviewers on G2 cite interface clutter and slow load times as the primary reason mid-market teams re-evaluate. Jira's project-scoped configuration model means performance degrades per project rather than across the entire workspace.
  • Jira's custom status and transition system supports complex multi-step approval chains and conditional branching that Wrike's workflow engine does not match for software development and IT service management use cases. Teams managing sprints, backlogs, and release trains cite Jira's workflow extensibility as the primary technical reason for the switch.
  • Engineering, product, and DevOps teams move to Jira for native integration with Bitbucket, GitHub, and GitLab—code commits, pull requests, and branch-linked issues appear automatically without a third-party connector. Wrike does not offer a native code-integration layer, forcing teams to use Wrike Integrate for less tightly coupled sync.
  • Enterprise-scale organizations cite Jira's advanced permission schemes, audit logs, IP whitelisting, and SAML SSO as the governance controls required for compliance. Wrike Enterprise bundles these features but at significantly higher per-seat custom pricing; Jira includes them on Premium ($13.08/user/month) with clearer tier boundaries.

Questions, answered

Wrike to Jira migration questions

How long does a Wrike to Jira migration take?

Most migrations land between three and five weeks for workspaces under 5,000 tasks with a single Space, no calculated custom fields, and a clean status mapping matrix. Migrations with multi-Space hierarchies, calculated custom fields, time entry histories exceeding 10,000 records, or large attachment sets (over 50 GB) extend to eight to fourteen weeks because of Jira workflow configuration, Calculated field translation, and bulk attachment re-linking work.

Do Wrike Automations, Workflows, and Dashboards migrate to Jira?

No. Wrike Automations (rule-based triggers), Workflow definitions (status sets and transitions), and Dashboard widgets do not migrate as executable code. Jira uses a different automation model (Jira Automation for Cloud or Jira Automation for Data Center) and a different Workflow schema with Status Categories. We deliver a written inventory of every active Wrike Automation with its trigger, conditions, actions, and a recommended Jira Automation equivalent. The customer's Jira admin or an Atlassian partner rebuilds them post-migration.

Will my Wrike comments and attachments transfer to Jira?

Comments and attachments are not included in Wrike's native CSV export and are lost if that method is used. FlitStack AI extracts task and project comments via the Wrike API and re-attaches them to the corresponding Jira Issues. Attachment download URLs are preserved and relinked to Jira Issues. If the Wrike account is deprovisioned after migration, any attachment URLs that were hosted in Wrike's DAM will become inaccessible—we recommend a pre-migration bulk download for accounts with critical attachment histories.

How are Wrike Custom Fields handled in Jira?

Wrike custom field types (DropDown, Numeric, Date, Currency, Percentage, Contacts, Checkbox, Calculated) map to equivalent Jira custom fields by type. Jira does not have a native Currency or Calculated field on Standard plans—Currency values migrate as Number fields and Calculated fields migrate as static Number values with a flag to recreate the formula post-migration using a Jira app or manual process. Custom fields must be created in Jira before record import begins.

Can we migrate Wrike time entries to Jira?

Yes. Wrike time logs migrate to Jira Worklog entries. On Jira Standard and above, native worklog is available without an app. On Jira Free, a Tempo plan is required—we flag this during scoping and migrate time entries as a separate deliverable after Tempo is installed. Duration-based Wrike entries (hours and dates only) are converted to start and end timestamps at migration time.

What happens to Wrike Spaces in Jira?

Wrike Spaces are top-level organizational containers with their own permission model. Jira does not have a Space equivalent. We map Spaces to Jira Projects using a naming convention that preserves the Space name, and we deliver a written Space-to-permission-group mapping table for the customer's Jira admin to implement as project roles and permission schemes post-migration. This is a manual configuration step.