Project Management migration

Migrate from SP Project Tracker to monday Work Management

Field-level mapping, validation, and rollback between SP Project Tracker and monday Work Management. We move data and schema; workflows are rebuilt natively in monday Work Management.

SP Project Tracker logo

SP Project Tracker

Source

monday Work Management

Destination

monday Work Management logo

Compatibility

58%

7 of 12

objects map 1:1 between SP Project Tracker and monday Work Management.

Complexity

CModerate

Timeline

2-3 weeks

Rollback included Accuracy guarantee Field-level validation

Overview

What this migration involves

Moving from SP Project Tracker to monday.com is an export-heavy migration because SP Project Tracker has no public REST API. All data leaves SP Project Tracker via CSV exports for Projects, Tasks, Time Entries, Team Members, and Attachments, which we then reconcile, clean, and transform in a staging environment before loading into monday.com through its API. The primary technical challenge is the subtask hierarchy: SP Project Tracker exports subtasks as a flat list with a parent_task_id column, which we reconstruct as monday.com subitems during import. Owner assignment in SP Project Tracker CSV often returns a display name without an email or user ID, so we cross-reference the Team Members export to resolve each assignee and map it to a monday.com team member by email before record insertion. We do not migrate SP Project Tracker workflows or automations as code because the platform has no automation features to speak of; we deliver a written map of any manual processes the customer wants to formalize in monday.com Automations post-migration.

Field-level fidelity

Every standard and custom field arrives verified.

Schema-aware mapping

AI proposes the map; you confirm before any record moves.

Relationships preserved

Parent–child, lookups, and ownership stay linked.

Full activity history

Calls, emails, meetings — with original timestamps.

Attachments & notes

Documents, uploads, and inline notes move with the record.

Why teams make this switch

Two sides of the same decision

Leaving

SP Project Tracker logo

SP Project Tracker

What's pushing teams away

  • No documented public API, which blocks automation and forces teams to manually export and re-enter data as the organization scales.
  • Lacks advanced project management features such as Gantt charts, resource management, or dependency tracking that growing teams eventually require.
  • Limited collaboration features compared to modern alternatives, leading teams to outgrow the platform as remote and distributed work becomes standard.
  • Performance or reliability concerns emerge at scale, with some users reporting the platform becomes sluggish with larger project portfolios.
  • Support responsiveness and product development pace lag behind faster-moving competitors, leaving customers without critical updates or fixes.

Choosing

monday Work Management logo

monday Work Management

What's pulling them in

  • Lowest onboarding friction of any mid-market PM tool — drag-and-drop boards and colorful UI mean non-technical team members contribute from day one without training.
  • Highly customizable board structure lets teams model their actual workflow rather than forcing a predefined template onto their process.
  • Generous free forever plan with two seats lets small teams or solo users validate the platform before committing budget or migrating data from elsewhere.
  • Integrations with Slack, Zoom, Google Drive, and CRM tools keep monday.com as a coordination hub rather than requiring teams to switch context constantly.
  • Multiple view modes — Kanban, Calendar, Gantt, Map, Chart — give different team members the visualization they prefer without switching tools.

Object mapping

How SP Project Tracker objects map to monday Work Management

Each row shows how a SP Project Tracker object lands in monday Work Management, including any object-level transformations, lookup resolution, or schema-design dependencies.

Typical mapping — final map is confirmed during the sample migration step.

SP Project Tracker

Project

maps to

monday Work Management

Board

1:1
Fully supported

SP Project Tracker Projects map to monday.com Boards. Each project name becomes the board name, project description becomes the board description, and project status (active/archived) maps to the board's Archived status. We create boards under a single Workspace or split across Workspaces based on the customer's folder structure in SP Project Tracker. Start and end dates from the project become optional columns on the board for timeline planning.

SP Project Tracker

Task

maps to

monday Work Management

Item

1:1
Fully supported

SP Project Tracker Tasks map to monday.com Items within a Board. Task name becomes Item name, assignee maps to the Person column (resolved via email matching against monday.com team members), due date maps to the Date column, priority maps to a Status column with labels (High, Medium, Low), and completion percentage maps to a Numbers column. We insert all Items before creating subitems to satisfy the parent record dependency.

SP Project Tracker

Subtask (via parent_task_id)

maps to

monday Work Management

Subitem

1:many
Fully supported

SP Project Tracker exports subtasks as a flat list with a parent_task_id column rather than as a nested structure. We detect subtask rows by checking for non-null parent_task_id values, group them by parent, then create monday.com Subitems under each parent Item in a second pass. Subitem columns (assignee, due date, status) map identically to top-level Items. We validate the reconstructed hierarchy against the source row count before closing the migration.

SP Project Tracker

Time Entry

maps to

monday Work Management

Time Tracking column or Numbers column

1:1
Fully supported

Time entries attach to tasks in SP Project Tracker and record hours worked. The destination depends on the customer's monday.com plan: on Pro ($16/seat) we create a native Time Tracking column on each board and populate it with entry-level data; on Standard ($9/seat) we create a Numbers column labeled Total Hours and sum hours per task. SP Project Tracker does not enforce a billable/non-billable flag consistently, so we flag entries with missing billable data for the customer to review before import.

SP Project Tracker

Attachment

maps to

monday Work Management

File column or mirror to cloud storage

1:1
Fully supported

SP Project Tracker stores some attachments as internal URLs valid only within the active session. We request temporary elevated access credentials during the attachment phase, download each file, validate the URL resolves to a downloadable asset, then re-upload to monday.com via the File column. For large attachment volumes (over 1,000 files), we recommend a mirror approach: store files in Google Drive or SharePoint and link them via the Integration column rather than uploading directly to monday.com storage.

SP Project Tracker

Team Member

maps to

monday Work Management

Team Member

1:1
Fully supported

Team members are referenced by name and email in SP Project Tracker tasks and time entries. We resolve each to a monday.com user identity using email matching. Any SP Project Tracker assignee without a matching email in monday.com becomes a placeholder entry in our reconciliation queue, and the customer provisions the corresponding monday.com account before record import resumes.

SP Project Tracker

Comment

maps to

monday Work Management

Update

1:1
Fully supported

SP Project Tracker task-level comments migrate as monday.com Updates on the corresponding Item. We preserve the author name, timestamp, and comment body as a chronological feed entry. Threaded nesting in SP Project Tracker flattens to a single Update chain in monday.com because monday.com does not support nested reply threads natively.

SP Project Tracker

Tag

maps to

monday Work Management

Tag or Labels column

lossy
Fully supported

SP Project Tracker tags are flat labels applied to tasks. We map them to monday.com Tags (universal labels across boards) or a Labels column (board-scoped) depending on the customer's tag usage. Tags containing special characters are converted to slug-safe format during import. We recommend Tags if the customer uses the same label across multiple boards.

SP Project Tracker

Custom Field (project-level)

maps to

monday Work Management

Board column (Board view)

lossy
Fully supported

SP Project Tracker project-level custom fields are stored as property bags. We extract all key-value pairs, assess each against monday.com's column type options (Text, Number, Date, Person, Status, Dropdown, Link, File), and create the closest matching column type on the destination board. Fields with no monday.com equivalent become a Text column with the original key:value format for manual restructuring.

SP Project Tracker

Custom Field (task-level)

maps to

monday Work Management

Item column

lossy
Fully supported

SP Project Tracker task-level custom fields map to Item columns on the destination board. We create each custom field as a dedicated column before importing Items so that the column exists at insert time. Multi-value custom fields map to Labels or Tags columns; date-formatted custom fields map to Date columns; numeric custom fields map to Numbers columns. The customer reviews unmapped fields during the staging validation pass.

SP Project Tracker

Project Status

maps to

monday Work Management

Board status (active/archived)

1:1
Fully supported

SP Project Tracker project status (Active, On Hold, Completed, Archived) maps to monday.com board state. Active and On Hold map to open boards; Completed maps to a board with all Items marked Done; Archived maps to the monday.com Archived status. We validate that archived boards in monday.com are accessible for read-only recovery if needed.

SP Project Tracker

Priority

maps to

monday Work Management

Status column or Labels column

lossy
Fully supported

SP Project Tracker priority values (High, Medium, Low, None) map to a monday.com Status column with color-coded labels (Red for High, Yellow for Medium, Green for Low, Gray for None). If the customer prefers visual tagging over status, we configure a Labels column instead and match the priority value to the corresponding label color.

Gotchas + challenges

What specifically takes care here

Platform-specific issues from each side, plus the pair-specific challenges that don't show up on either platform's page on its own.

SP Project Tracker logo

SP Project Tracker gotchas

High

No public API requires export-first migration

High

Owner assignment drops during bulk CSV export

Medium

Attachment URLs become inaccessible after export

Medium

Subtask hierarchy flattened in CSV output

monday Work Management logo

monday Work Management gotchas

High

Subitems have no bulk export endpoint

High

API complexity budget constrains query depth

Medium

Daily call limits vary sharply across plan tiers

Medium

Automation and integration rules do not export via API

Low

Saved views are not exposed via API

Pair-specific challenges

  • No API on SP Project Tracker forces CSV-first migration

    SP Project Tracker does not publish a public REST API or documented export endpoints. All migration work begins with CSV exports for each object type: Projects, Tasks, Time Entries, Team Members, and Attachments. We pull these separately, reconcile cross-references in our staging environment, then load into monday.com via its API. If the customer's data volume exceeds what CSV exports can cleanly represent, we chunk the data and validate referential integrity at each pass.

  • Subtask hierarchy flattened in CSV output

    The CSV export from SP Project Tracker renders subtasks as a flat list with a parent_task_id column rather than as a nested structure. We detect subtask rows by checking for non-null parent_task_id values, then reconstruct the hierarchy in monday.com by creating subitems under each parent Item in a second pass. We validate the reconstructed hierarchy against the source row count before closing the migration to catch any missing parent references.

  • Owner assignment drops to display name only in bulk CSV

    When exporting tasks via CSV, the owner/assignee field sometimes returns a display name only, without an associated email or user ID. We detect this by comparing the exported assignee against the Team Members export and flag any unresolved names. Customers must confirm user mappings before we commit assignments in monday.com, preventing Items from landing with unresolvable owner references.

  • Attachment URLs expire after SP Project Tracker session ends

    SP Project Tracker stores some attachments as internal URLs valid only within the active session or account. Downloading these during migration requires authenticated access to the platform's file store. We request temporary elevated access credentials during the attachment phase and validate each URL resolves to a downloadable file before queuing it for re-upload to monday.com. Large attachment volumes (over 1,000 files) may require a cloud storage mirror approach (Google Drive or SharePoint integration) to avoid monday.com storage limits.

  • monday.com time tracking requires Pro plan or manual column setup

    monday.com's native Time Tracking column is available only on the Pro plan ($16/seat/mo) and above. Migrating time entries from SP Project Tracker to Standard plan ($9/seat) requires mapping hours to a Numbers column instead, which does not support the built-in timer or automatic sum display. We confirm the customer's monday.com plan during discovery and configure the appropriate column type for time-entry mapping.

Migration approach

Six steps for a successful SP Project Tracker to monday Work Management data migration

  1. CSV export and object inventory

    We guide the customer through exporting all object types from SP Project Tracker: Projects, Tasks, Time Entries, Team Members, and Attachments. Each export runs separately to preserve field headers and avoid row-limit truncation. We inventory the record counts per object, note any incomplete or truncated exports, and identify the owner assignment fields that require cross-reference with the Team Members export. We also request elevated attachment access credentials during this phase so that file downloads can proceed in parallel.

  2. Data cleaning, owner resolution, and subtask detection

    We load all CSV exports into a staging environment and run a cleaning pass: deduplication, date format normalization, and empty-field flagging. We cross-reference task assignee names against the Team Members export by email to build a user mapping table. Any assignee without an email match enters the reconciliation queue for the customer's admin to provision a monday.com account. We detect subtask rows by scanning for non-null parent_task_id values and group them by parent for hierarchy reconstruction.

  3. monday.com board architecture design

    We design the monday.com board structure based on the customer's SP Project Tracker project hierarchy: one board per project, or grouped boards under Workspaces if the customer prefers a portfolio view. We define column types for each mapped field (Status, Person, Date, Numbers, Labels, Text), create any board-level custom columns before item import, and configure the Pro plan Time Tracking column or Standard plan Numbers column depending on the customer's subscription tier. Subitem support is enabled on each board during this phase.

  4. Sandbox import and reconciliation

    We run a full import into a monday.com Sandbox or secondary workspace using production-like data volume. The customer's project manager reconciles record counts (Projects in, Items in, Subitems in, Time entries in, Attachments in), spot-checks 20-30 random Items against the SP Project Tracker source, and validates that subtask hierarchy, assignee mapping, and custom field data match. Any mapping corrections happen in this phase before production import begins.

  5. Production import in dependency order

    We run production import in record-dependency order: Team Members (validated), Boards (created from Projects), Items (imported from Tasks), Subitems (created in second pass from the subtask group), Time Tracking or Numbers columns (populated from Time Entries), Attachments (downloaded and re-uploaded), Comments (imported as Updates), and Tags/Labels (applied to Items). Each phase emits a row-count reconciliation report before the next phase begins. We use monday.com's batch mutation API with exponential backoff on rate-limit responses.

  6. Cutover, validation, and automation rebuild handoff

    We freeze SP Project Tracker writes during cutover, run a final delta import of any records modified during the migration window, then enable monday.com as the system of record. We deliver a written map of any manual processes or project conventions from SP Project Tracker that the customer may want to formalize as monday.com Automations (status-change triggers, deadline notifications, assignment rules). We support a one-week hypercare window where we resolve any reconciliation issues. We do not rebuild SP Project Tracker processes as monday.com Automations as part of standard migration scope; that is a separate engagement.

Platform deep dives

Context on both ends of the pair

SP Project Tracker logo

SP Project Tracker

Source

Strengths

  • Native SharePoint/Office 365 deployment means data lives inside the customer tenant — backups, security, and compliance inherit from Microsoft 365 rather than a separate SaaS vendor.
  • No-code, fully customisable by SharePoint power users — lists, views, and templates are SharePoint primitives so admins can extend the data model without buying developer time.
  • Perpetual licence option ($1,500 for a single site with unlimited users) is cheaper at scale than per-user SaaS PMs for organisations already running SharePoint on-premise.
  • Multiple views (Gantt, Task, Activities, Status, Super View) and reusable project templates support both rollup and drill-down without switching tools.
  • Collaboration artefacts (documents, discussions, email correspondence) attach directly to projects through standard SharePoint integrations, leveraging Outlook and Teams that the org already runs.

Weaknesses

  • Tied to SharePoint — customers on Google Workspace, Notion, or pure-SaaS PM stacks cannot adopt it.
  • Feature ceiling is the SharePoint list model; teams needing complex dependencies, resource levelling, or portfolio-grade reporting outgrow it.
  • No public REST API beyond what SharePoint itself exposes; integrations rely on Microsoft Graph / SharePoint REST against the underlying lists, not a SP-Project-Tracker-specific endpoint.
  • Limited public review footprint compared with Microsoft Project, Smartsheet, Asana, or Monday.
  • Power-user customisation power cuts both ways — without governance, each project site drifts to its own field set, complicating cross-project reporting and migrations.
monday Work Management logo

monday Work Management

Destination

Strengths

  • Drag-and-drop board UI with near-zero learning curve for non-technical users entering project data for the first time.
  • 20+ column types and unlimited custom columns let teams model arbitrarily complex data structures without developer help.
  • Multi-view support — Kanban, Gantt, Calendar, Timeline, Chart, Map — satisfies different team members without forcing a single layout.
  • Automations cover common trigger-action patterns for teams without dedicated developers to write custom scripts.
  • Free plan for 2 seats and a 14-day trial on all paid tiers make evaluation risk-free before committing to migration scope.

Weaknesses

  • Per-seat pricing with no enterprise flat-rate option means costs scale linearly with headcount, making it expensive at 50+ seats.
  • Subitems lack bulk API access, making them problematic for CRM-style use cases where contact records live as subitems under a company board.
  • Automations and advanced views are gated behind Pro and Enterprise tiers, creating feature deserts on entry-level plans.
  • Dependency column is visually limited — no critical path, no auto-rescheduling, and cross-board dependencies require manual link management.
  • No native document management; docs, wikis, and knowledge bases require a separate integration or third-party workaround.

Complexity grading

How hard is this migration?

Moderate Project Management migration. 7 of 8 objects need a mapping; the rest are 1:1.

C

Overall complexity

Moderate migration

Derived from compatibility, mapping clarity, API constraints, and data volume across SP Project Tracker and monday Work Management.

  • Object compatibility

    D

    7 of 8 objects need a mapping; the rest are 1:1.

  • Field mapping clarity

    C

    Field mapping is derived from defaults — final spec confirmed during the sample migration.

  • Timeline complexity

    B

    8-object category — typical timelines run 2–7 days end-to-end.

  • API constraints

    B

    SP Project Tracker: Bounded by SharePoint and Microsoft Graph throttling policies (per-tenant resource units; documented by Microsoft). SP Project Tracker itself imposes no separate quota..

  • Data volume sensitivity

    A

    SP Project Tracker exposes a bulk API — large-volume migrations stream efficiently.

Estimator

Estimate your SP Project Tracker to monday Work Management migration cost

Rule-based pricing — no per-record fees, no manual quotes. Migrations over 2M records are scoped individually.

Step 1

What are you migrating?

Pick a category, then your source and destination platforms.

Category

FAQ

Frequently asked questions about SP Project Tracker to monday Work Management data migrations

Answers to the questions buyers ask most during SP Project Tracker to monday Work Management migration scoping. Not seeing yours? Book a call.

Can't find your answer?

Walk through your SP Project Tracker to monday Work Management migration with a real engineer — 30 minutes, free, written quote within 24 hours.

Book a free 30 minute consultation

Most migrations land between two and three weeks for accounts under 2,000 tasks and 50 projects with clean owner email data. Migrations with large attachment volumes (over 5,000 files), complex subtask nesting (5+ levels), or incomplete owner email data requiring manual user reconciliation move to four to seven weeks because of the CSV reconciliation pass, file download validation, and multi-phase import. monday.com does not have a bulk import wizard for complex relational data, so all imports run through the API with rate-limit pacing.

Adjacent paths

Related migrations to explore

Ready when you are

Move from SP Project Tracker.
Land in monday Work Management, intact.

Tell us record counts and timeline. We'll come back with a written quote inside 1 business day — no commitment, no sales pitch.

Accuracy guarantee Rollback included Quote in 1 business day