Project Management migration
Field-level mapping, validation, and rollback between AceProject and Jira. We move data and schema; workflows are rebuilt natively in Jira.
AceProject
Source
Jira
Destination
Compatibility
8 of 11
objects map 1:1 between AceProject and Jira.
Complexity
CModerate
Timeline
3-5 weeks
Overview
Moving from AceProject to Jira is a structural data migration that requires resolving a fundamentally different data model. AceProject is project-centric with time tracking and expense management as first-class features; Jira is issue-centric with Projects as containers and Issues as the atomic work unit. We export via AceProject's admin CSV tool, resolve user-project membership gaps (AceProject does not auto-assign imported users to Projects), handle custom field visibility (values only render in AceProject's new interface), and import into Jira in dependency order: Projects first, then Users, then Issues with resolved parent links and Assignee lookups. Time entries map to Jira worklog; expense records, which have no native Jira equivalent, are handled through custom fields or a companion configuration plan. Workflows, document attachments, and Gantt configurations do not migrate; we deliver a written inventory of these for the customer's admin to rebuild in Jira.
Every standard and custom field arrives verified.
AI proposes the map; you confirm before any record moves.
Parent–child, lookups, and ownership stay linked.
Calls, emails, meetings — with original timestamps.
Documents, uploads, and inline notes move with the record.
Why teams make this switch
Leaving
What's pushing teams away
Choosing
What's pulling them in
Object mapping
Each row shows how a AceProject object lands in Jira, including any object-level transformations, lookup resolution, or schema-design dependencies.
Typical mapping — final map is confirmed during the sample migration step.
AceProject
Project
Jira
Project
1:1AceProject Projects map directly to Jira Projects. We export project metadata (name, description, status, start date, end date) via the admin Export Data tool. In Jira, we pre-create the destination Project with the appropriate Project Type (Software for engineering teams, Business for operations teams) and set the Default Scheme to match the imported issue types. If AceProject uses custom project-level fields, we map these to Jira Project Properties or custom fields scoped to the project.
AceProject
Task
Jira
Issue
1:1AceProject Tasks are the core work unit and map to Jira Issues (Story, Task, or Bug depending on the type discriminator in the export). The AceProject task Name becomes Jira Summary, Description maps to Description, Estimated Hours maps to the Jira custom field Original Estimate (or the native Time Tracking estimate field if enabled), and Assignee resolves via User email lookup. Task status (New, In Progress, Closed) maps to Jira Status (To Do, In Progress, Done) with workflow transitions configured before migration.
AceProject
Subtask
Jira
Sub-task
1:1AceProject Subtasks nest under Tasks and map to Jira Sub-task issue type. We flatten the parent-child relationship during export and reconstruct it in Jira by resolving the parent Issue key at migration time. Jira Sub-tasks inherit the parent Project context and can have their own Assignee, Status, and due date. The AceProject subtask name becomes the Jira Summary, and the parent Task reference becomes the Jira Parent Link.
AceProject
User
Jira
User
1:1AceProject Users map to Jira Users. We export all User records including custom User fields. AceProject does not auto-assign imported users to the destination Project, so we flag every User referenced in tasks and generate a Jira project membership add-list for the customer's admin to provision before or after migration. Custom User fields from AceProject map to Jira User Properties or custom fields on the User entity.
AceProject
Time Entry
Jira
Worklog
1:1AceProject Time Entries (hours, date, billing rate, task association) map to Jira Issue Worklog records. We resolve the parent Issue reference by matching AceProject task ID to the Jira Issue key assigned during the Task-to-Issue migration phase. Hours map to Time Spent, date maps to Started, and billing rate from AceProject is stored in a custom worklog field. If Jira Time Tracking is not enabled in the destination, we create a custom Worklog custom field to hold billable hours data.
AceProject
Expense
Jira
Custom Fields or Configuration Plan
lossyAceProject Expenses have no native Jira equivalent. We handle this through a two-track approach: for teams with Jira Service Management or a companion financial tool, we map Expenses to a custom Issue type or linked records. For teams using Jira Software alone, we create custom fields on the relevant Issue type (Expense Amount, Expense Category, Expense Date, Expense Currency) and flag this as a configuration item in the handoff document. We also flag that normal AceProject users without the 'Can see expense data no matter what' role may have restricted expense visibility — we run export under an administrator account to capture all expense records.
AceProject
Document
Jira
Attachments and Configuration Plan
1:1AceProject Documents (file metadata and commenting) map to Jira Issue Attachments. We export document metadata (filename, upload date, associated project or task) and generate a file reference list. Actual file content transfer depends on whether the files are accessible via URL or require separate download-and-upload. Jira's Attachment API accepts files up to 64MB per attachment. Comment threads from document commenting are flattened into Jira Issue comments with author attribution preserved.
AceProject
Task Dependency
Jira
Issue Link
1:1AceProject Task Dependencies (dependency type and linked Task ID) map to Jira Issue Links. We export the dependency type (Finish-to-Start, Start-to-Start, or custom) and the referenced Task ID, then resolve the target Issue key during migration. Jira Issue Link types (Blocks, Is Blocked By, Relates To) are configured in the destination before migration. Finish-to-Start dependencies map to Blocks; other dependency types map to Relates To with a custom link type note.
AceProject
Task Custom Fields
Jira
Custom Fields
lossyAceProject Task Custom Fields (Boolean, Date, List, Numeric, Text, User types) map to Jira Custom Fields. We detect the AceProject interface version during scoping — if the account uses the classic interface, custom field values may not be exported completely, and we recommend switching to the new interface before export. Custom field context in Jira (which projects and issue types a custom field applies to) is configured before migration. We map Boolean to Jira Checkbox, Date to Jira Date Picker, Numeric to Jira Number Field, and List to Jira Select or Radio Button.
AceProject
User Custom Fields
Jira
User Properties or Custom Fields
lossyAceProject User-level custom fields export as key-value pairs per user. These map to Jira User Properties if the values are system-level, or to custom fields on a dedicated User configuration object if the destination Jira instance supports it. Many Jira configurations store user-level metadata as project membership attributes or Issue-level custom fields referencing the Assignee rather than as native user properties.
AceProject
Comment
Jira
Comment
1:1AceProject document and task comments migrate to Jira Issue Comments. Threaded comment structures are flattened during migration — each comment becomes a standalone Jira comment with author and timestamp preserved. The chronological order of comments is maintained by setting the Jira comment creation date to the original AceProject timestamp. Nested replies are appended as separate comments with a prefix referencing the parent thread.
| AceProject | Jira | Compatibility | |
|---|---|---|---|
| Project | Project1:1 | Fully supported | |
| Task | Issue1:1 | Fully supported | |
| Subtask | Sub-task1:1 | Fully supported | |
| User | User1:1 | Fully supported | |
| Time Entry | Worklog1:1 | Fully supported | |
| Expense | Custom Fields or Configuration Planlossy | Fully supported | |
| Document | Attachments and Configuration Plan1:1 | Fully supported | |
| Task Dependency | Issue Link1:1 | Fully supported | |
| Task Custom Fields | Custom Fieldslossy | Mapping required | |
| User Custom Fields | User Properties or Custom Fieldslossy | Fully supported | |
| Comment | Comment1:1 | Fully supported |
Gotchas + challenges
Platform-specific issues from each side, plus the pair-specific challenges that don't show up on either platform's page on its own.
AceProject gotchas
Task import does not auto-assign users to Projects
Custom fields only visible in the new interface
CSV import requires DOS-style CRLF line endings
Expense field visibility gated by user role
Jira gotchas
Unsupported workflow validators silently skipped during migration
Custom fields converted to flat text labels when migrating to non-Jira platforms
Historical status-change timestamps lost when exporting without a Marketplace plugin
Attachment import failures from oversized files and JQL reference corruption
Points-based API rate limits enforced on Jira Cloud apps from March 2026
Pair-specific challenges
Migration approach
Pre-flight and scoping
We audit the AceProject account across interface version (classic vs new), active projects, user count, task volume, subtask depth, dependency graph complexity, custom field inventory (Task and User types), expense record count, and time entry volume. We confirm the exporting account has administrator privileges to bypass expense visibility restrictions and verify the interface version to assess custom field export completeness. We also inventory any document file URLs for attachment transfer planning. The scoping output is a written migration scope document and a Jira configuration checklist for the customer's admin.
Jira schema design
We design the destination Jira configuration before any data is migrated. This includes provisioning the Jira Project with the appropriate Project Type and permissions scheme, configuring the Issue Type Hierarchy (Epic, Story, Task, Sub-task), setting up Status values that match the AceProject task lifecycle, defining custom fields for AceProject custom field equivalents and expense data, configuring Issue Link types (Blocks, Is Blocked By, Relates To) to match the AceProject dependency model, and designing the workflow transitions required to support the imported statuses. Schema is validated in a Jira Sandbox or test environment before production migration begins.
User provisioning and reconciliation
We extract every distinct AceProject User referenced on Tasks, Time Entries, and Expenses and match by email against the Jira destination User table. Any Users without a matching Jira account go to a reconciliation queue for the customer's admin to provision before migration. We generate the Jira project membership add-list so that all resolved users are added to the target project with appropriate roles. This step must complete before task import because Jira Assignee resolution requires both a valid User and project membership.
Sandbox migration and validation
We run a full migration into the Jira test environment using production-like data volume. The customer's project manager or admin reconciles record counts (Projects in, Issues in, Worklog entries in), spot-checks 25-50 records against the AceProject source, and validates that subtask parent links, issue dependencies, and custom field values are correctly resolved. Any mapping corrections happen here. The customer signs off on the sandbox validation before production migration begins.
Production migration in dependency order
We run production migration in record-dependency order: Jira Project (pre-created and validated), Jira Users (provisioned and project-membership verified), Issues (Tasks and Subtasks with Assignee, Status, and parent link resolved), Worklog (time entries linked to parent Issues by resolved Issue key), Issue Links (dependencies mapped to Blocks or Relates To), Custom Fields (custom field values populated after issue creation), and Comments (flattened comment threads posted to each Issue). Each phase emits a row-count reconciliation report before the next phase begins.
Cutover, validation, and configuration handoff
We freeze AceProject writes during cutover, run a final delta migration of any records modified during the migration window, then enable Jira as the system of record. We deliver a written configuration inventory covering workflows, notification schemes, automation rules, SLA configurations, and document attachment URLs that require manual rebuild in Jira. We support a one-week hypercare window where we resolve any data reconciliation issues raised by the project team. We do not rebuild AceProject Gantt configurations as Jira Advanced Roadmaps, configure automation rules, or design new workflows inside the migration scope; these are documented for the customer's admin or a Jira partner to handle separately.
Platform deep dives
AceProject
Source
Strengths
Weaknesses
Jira
Destination
Strengths
Weaknesses
Complexity grading
Moderate Project Management migration. 4 of 8 objects need a mapping; the rest are 1:1.
Overall complexity
Moderate migration
Derived from compatibility, mapping clarity, API constraints, and data volume across AceProject and Jira.
Object compatibility
4 of 8 objects need a mapping; the rest are 1:1.
Field mapping clarity
Field mapping is derived from defaults — final spec confirmed during the sample migration.
Timeline complexity
8-object category — typical timelines run 2–7 days end-to-end.
API constraints
AceProject: Not publicly documented — typical SaaS limits assumed and confirmed during scoping..
Data volume sensitivity
AceProject doesn't expose a bulk API — REST + parallelization used for high-volume runs.
Estimator
Rule-based pricing — no per-record fees, no manual quotes. Migrations over 2M records are scoped individually.
Step 1
Pick a category, then your source and destination platforms.
Category
FAQ
Answers to the questions buyers ask most during AceProject to Jira migration scoping. Not seeing yours? Book a call.
Walk through your AceProject to Jira migration with a real engineer — 30 minutes, free, written quote within 24 hours.
Book a free 30 minute consultationAdjacent paths
Other ways to leave AceProject
Other ways to arrive at Jira
Same-Project Management migrations
Ready when you are
Tell us record counts and timeline. We'll come back with a written quote inside 1 business day — no commitment, no sales pitch.