ERP migration

Migrate from Adm Cloud to Infor CloudSuite Corporate

Field-level mapping, validation, and rollback between Adm Cloud and Infor CloudSuite Corporate. We move data and schema; workflows are rebuilt natively in Infor CloudSuite Corporate.

Adm Cloud logo

Adm Cloud

Source

Infor CloudSuite Corporate

Destination

Infor CloudSuite Corporate logo

Compatibility

83%

10 of 12

objects map 1:1 between Adm Cloud and Infor CloudSuite Corporate.

Complexity

BStandard

Timeline

6-10 weeks

Rollback included Accuracy guarantee Field-level validation

Overview

What this migration involves

Moving from Adm Cloud to Infor Cloudsuite is an ERP-to-ERP structural migration across two fundamentally different data architectures. Adm Cloud stores chart-of-accounts, receivables/payables, and item masters in a modular LATAM-centric schema with no documented public API, meaning all extraction paths run through CSV exports or direct database read access. Infor Cloudsuite ships a built-in migration utility with predefined table mappings and a Data Assessment Report process, but that utility assumes a structured SQL source database rather than a CSV export. We bridge that gap by transforming Adm Cloud CSV exports into Infor-compatible staging tables, resolving parent-child dependencies (account codes before journal lines, customer records before open invoices), and mapping LATAM-specific tax codes (SAT, CFDI) to the destination's equivalent regime configuration. We do not migrate Adm Cloud's custom workflows, e-commerce module automations, or BI report definitions; these require rebuild by the customer's Infor administrator or an Infor services partner post-migration. Infor Cloudsuite's industry-specific editions (Industrial, Distribution, Food & Beverage, Automotive, and others) each ship with pre-configured industry data models, so the target edition selection during scoping determines which Infor module set receives the migrating data.

Field-level fidelity

Every standard and custom field arrives verified.

Schema-aware mapping

AI proposes the map; you confirm before any record moves.

Relationships preserved

Parent–child, lookups, and ownership stay linked.

Full activity history

Calls, emails, meetings — with original timestamps.

Attachments & notes

Documents, uploads, and inline notes move with the record.

Why teams make this switch

Two sides of the same decision

Leaving

Adm Cloud logo

Adm Cloud

What's pushing teams away

  • Performance degrades at peak hours — a verified Capterra reviewer reported the system tends to slow down at certain hours of the day, suggesting server capacity constraints during regional business peaks.
  • Geographic concentration limits use outside Latin America — published country coverage spans Costa Rica, Ecuador, El Salvador, Guatemala, Honduras, Jamaica, Nicaragua, Panama, Puerto Rico, Dominican Republic, Trinidad & Tobago, and USA, with no European, APAC, or African footprint.
  • Pricing is sales-led with no public price list, making self-serve evaluation impossible — buyers must engage with sales for both Packs and Enterprise tiers.
  • Learning curve is non-trivial — the same Capterra reviewer noted the platform reveals its potential only after an initial onboarding period, which slows time-to-value for teams expecting modern SaaS ramp speed.
  • Limited independent review footprint — only one verified review on Capterra and very few G2 reviews make it hard for buyers to triangulate operational risks across many customer profiles before committing.

Choosing

Infor CloudSuite Corporate logo

Infor CloudSuite Corporate

What's pulling them in

  • Infor CloudSuite is industry-specific out of the box — manufacturing, distribution, healthcare, and food & beverage editions ship with preconfigured workflows that reduce the need for extensive customization and accelerate time to value for operations-heavy organizations.
  • The platform's deep integration with Excel for financial reporting is frequently cited as a key productivity feature, allowing finance teams to pull data directly and make changes without leaving familiar tooling.
  • AWS-hosted multi-tenant deployment eliminates data center management for IT teams, and Infor OS provides a unified integration layer (ION) that connects the CloudSuite to third-party applications without point-to-point middleware.
  • Organizations with multi-site or multi-country operations choose Infor for its multicurrency, multilanguage, and local regulatory compliance capabilities across 175+ countries, which simplifies consolidation for global CFOs.
  • The two-tier ERP strategy positioning lets corporate headquarters run CloudSuite while subsidiaries run lighter instances, which appeals to complex organizational structures that want standardization without full replacement.

Object mapping

How Adm Cloud objects map to Infor CloudSuite Corporate

Each row shows how a Adm Cloud object lands in Infor CloudSuite Corporate, including any object-level transformations, lookup resolution, or schema-design dependencies.

Typical mapping — final map is confirmed during the sample migration step.

Adm Cloud

Customers

maps to

Infor CloudSuite Corporate

Customer (Business Partner)

1:1
Fully supported

Adm Cloud Customer records map to Infor Business Partner records with a party type of Customer. We preserve billing address, credit limit, payment terms, and the LATAM-specific fiscal ID (RFC in Mexico, RUC in Peru, CNPJ in Brazil) as the Infor Business Partner tax registration number. If Adm Cloud uses a separate contact model within Customer, we extract contacts to Infor Contact records linked to the Business Partner. Multi-currency pricing on the customer record maps to the Infor Business Partner's currency settings. Inactive customers are excluded from the default scope unless explicitly requested.

Adm Cloud

Vendors

maps to

Infor CloudSuite Corporate

Supplier (Business Partner)

1:1
Fully supported

Adm Cloud Vendor records map to Infor Business Partner records with a party type of Supplier. Payment terms, bank details, and the vendor's tax registration number transfer as-is. We flag any vendors that share the same tax ID as an existing customer record (common in LATAM where the same legal entity can be both customer and supplier) and create a single Business Partner with dual party types rather than duplicate records.

Adm Cloud

Items / Products

maps to

Infor CloudSuite Corporate

Item Master

1:1
Mapping required

Adm Cloud Item records map to Infor Item Master. We normalize variant structures ( Adm Cloud Pack variant schemas vs Enterprise custom variants) into a flat SKU model where variants appear as child rows with their own item codes. Cost layers from Adm Cloud map to Infor cost element structures, and pricing tiers map to Infor price lists. The Infor migration utility supports predefined item table mappings; we add custom mappings for any Adm Cloud-specific fields (e.g., HS codes for international trade, SAT product codes for Mexican tax compliance) that have no direct Infor counterpart and flag them for manual review before import.

Adm Cloud

Chart of Accounts

maps to

Infor CloudSuite Corporate

GL Account

1:1
Fully supported

Adm Cloud account tree (with codes, names, types, and parent-child hierarchy) maps directly to the Infor GL Account structure. We preserve account codes as the Infor account identifier and map Adm Cloud account types (Asset, Liability, Equity, Revenue, Expense) to Infor account classifications. Tax codes attached to specific accounts in Adm Cloud require explicit mapping to Infor tax codes during the LATAM tax configuration phase. The chart of accounts must be imported before any journal entries or AP/AR records because every transaction references an account code.

Adm Cloud

Open AP / AR

maps to

Infor CloudSuite Corporate

AP Invoice / AR Invoice (Open Items)

1:1
Mapping required

Outstanding AP and AR invoices from Adm Cloud map to Infor open item records. Currency code, exchange rate at invoice date, due date, and aging bucket data transfer directly. We chunk by date range (quarterly batches) to avoid import timeouts and flag any invoices in MXN/USD/COP tri-currency setups for explicit customer sign-off because exchange rate handling differs between platforms. Payment terms on the invoice header map to Infor due date rules. Credit memos and prepayment applications map as negative open items.

Adm Cloud

Journal Entries

maps to

Infor CloudSuite Corporate

GL Journal Entry

1:1
Mapping required

Historical journals are the highest-volume migration object and must be sequenced after the chart of accounts. We split by fiscal period (typically annual batches) and transform Adm Cloud line items into Infor GL journal entry format with debit/credit amounts, account code references, and source document references. Recurring journal templates in Adm Cloud do not transfer as automation (no workflow migration); we list them in the automation inventory for the customer to rebuild in Infor. The Infor Data Assessment Report flags any unbalanced journals before commit.

Adm Cloud

Users

maps to

Infor CloudSuite Corporate

User

1:1
Mapping required

Adm Cloud user records with role, department, and module permissions map to Infor User records with role assignment. Role names differ between Adm Cloud Packs and Enterprise; we map by closest-capability matching during the discovery phase and document any gaps where an Adm Cloud permission has no direct Infor equivalent. We do not migrate Adm Cloud user passwords; Infor handles authentication via its own identity layer.

Adm Cloud

Fixed Assets

maps to

Infor CloudSuite Corporate

Fixed Asset

1:1
Mapping required

Adm Cloud asset master records (acquisition cost, useful life, depreciation method, residual value, location, asset tag) map to Infor Fixed Asset records. Depreciation methods differ between platforms; we map declining balance to Infor declining balance equivalents and flag any ADM-specific depreciation methods without a direct Infor counterpart. Accumulated depreciation to date transfers as an opening balance entry rather than a retroactive journal reconstruction.

Adm Cloud

Documents

maps to

Infor CloudSuite Corporate

Document Management (Infor IDM)

1:1
Mapping required

Binary attachments stored in Adm Cloud's document module (PDFs, images, exported reports) are exported as files and re-associated in Infor Document Management (IDM) by matching the parent record ID. We create a file-to-record lookup table during discovery so that document re-linking happens programmatically rather than manually. Documents without a resolvable parent record are exported to a catch-all Infor IDM folder for manual classification.

Adm Cloud

Tax Codes

maps to

Infor CloudSuite Corporate

Tax Code / Tax Regime

lossy
Mapping required

Adm Cloud LATAM tax codes (SAT codes for Mexico, CFDI for invoicing compliance, regional VAT codes) require explicit mapping to Infor's tax regime configuration for the destination CloudSuite edition. This is a configuration step that runs in parallel with data migration, not a data import. We extract the full Adm Cloud tax code table and produce a written tax mapping matrix; the customer's Infor administrator or tax consultant applies the Infor tax regime configuration before AP/AR and invoice data is loaded because tax codes are validated at import time.

Adm Cloud

Custom Fields

maps to

Infor CloudSuite Corporate

Custom Fields / Extended Properties

lossy
Mapping required

Custom fields on standard Adm Cloud objects are discovered during pre-migration and mapped to Infor extended properties. For Enterprise-tier Adm Cloud tenants, any custom objects without a standard Infor counterpart are documented in the custom object inventory. We do not create custom objects inside Infor; that is a schema design step performed by the customer's Infor consultant. We deliver a field-level mapping spreadsheet showing every Adm Cloud custom field, its data type, and the recommended Infor target (standard field, extended property, or JSON blob if no typed field exists).

Adm Cloud

E-Commerce Orders

maps to

Infor CloudSuite Corporate

Sales Order

1:1
Mapping required

Where the Adm Cloud e-commerce module is active, order headers and line items map to Infor Sales Order records. Payment status, gateway references, and fulfillment status map to Infor order lifecycle states. We flag any orders in a pending-payment state for customer resolution before import because Infor's order validation requires payment terms or a payment reference. Integration connections between the e-commerce platform and Adm Cloud do not migrate; the customer configures a new Infor integration post-migration.

Gotchas + challenges

What specifically takes care here

Platform-specific issues from each side, plus the pair-specific challenges that don't show up on either platform's page on its own.

Adm Cloud logo

Adm Cloud gotchas

High

No public REST API documentation discovered in research

Medium

Modular configuration means no two tenants are alike

Medium

Enterprise tier exposes deeper data access than Packs

Medium

LATAM-specific tax and currency handling

Infor CloudSuite Corporate logo

Infor CloudSuite Corporate gotchas

High

Infor OS tier-based usage limits gate API and BaaS capabilities

Medium

Custom Fields use inconsistent naming across Infor editions

Medium

SQL migration utility requires source database access

Medium

Multi-site and multi-currency data require separate period closure sequencing

Low

REST API payload and timeout limits restrict bulk migration throughput

Pair-specific challenges

  • LATAM tax code mapping requires explicit customer sign-off before AP/AR load

    Adm Cloud's LATAM tax configuration (SAT codes for Mexico, CFDI compliance settings, and multi-currency MXN/USD/COP tri-currency setups) has no automated translation to Infor Cloudsuite's tax regime. Infor's tax codes are validated at import time for AP invoices, AR invoices, and journal entries, and any unmapped tax code will reject the entire record batch. We extract the full Adm Cloud tax code table, produce a written mapping matrix, and hold AP/AR and journal data migration until the customer's Infor administrator or tax consultant confirms the Infor tax regime is configured. Tri-currency scenarios require explicit sign-off on exchange rate handling because Adm Cloud and Infor apply rounding differently at the invoice line level.

  • No Adm Cloud API means CSV export sequencing determines what migrates

    Adm Cloud has no documented REST API, OAuth endpoints, or developer portal. All data extraction relies on CSV exports from the platform UI or direct database read access (Enterprise tier). We confirm the available export mechanism during scoping because UI-based CSV exports have row limits (typically 10,000-50,000 rows depending on the module) that require chunking. Large item masters (100,000+ SKUs) or customer lists exceeding export limits must be split into multiple export runs with a record continuity key. We do not assume database read access is available unless the customer confirms it during discovery.

  • Infor migration utility expects SQL source; Adm Cloud CSV requires staging transformation

    Infor CloudSuite's built-in Migration Utility is designed for SQL-to-SQL migration paths where source and target schemas are both accessible. For Adm Cloud migrations (CSV export or database read), we must transform the source data into the staging table format the Infor utility expects. This includes mapping Adm Cloud field names to Infor column names, applying Infor data type constraints (date formats, numeric precision, required fields), and building a dependency-ordered import sequence that respects Infor's prerequisite data rules (accounts before journals, customers before invoices). The Infor Data Assessment Report catches mismatches post-transform but requires a full staging run before it produces actionable output.

  • Adm Cloud module enumeration gap causes entire datasets to be missed at scoping

    Adm Cloud's modular configuration means no two tenants have the same active module set. A tenant with the manufacturing module active will have production orders and BOMs that a standard financial migration will not capture. We enumerate active modules during discovery by reviewing the Adm Cloud tenant's module license list and running a schema scan of the source database or export output. Migrations scoped without this step routinely miss the e-commerce module (order headers and line items), the manufacturing module (BOMs, work orders, routings), or the human management module (employee records that may have been used as vendors or customers in LATAM contexts). We include a module enumeration checklist in every Adm Cloud discovery worksheet.

  • Historical journal volume exceeds standard import batch thresholds

    Adm Cloud tenants with multi-year histories often carry 500,000 to several million journal line items. The Infor CloudSuite migration utility processes import batches sequentially, and the Data Assessment Report must run on each batch before commit. We split journal migration by fiscal year, run a parallel historical journal migration in staging, and schedule the production journal import in nightly batches to avoid blocking daytime Infor users. The reconciliation step compares total debit and credit sums from Adm Cloud against Infor GL trial balance after each batch to confirm zero net variance before proceeding.

Migration approach

Six steps for a successful Adm Cloud to Infor CloudSuite Corporate data migration

  1. Discovery and module enumeration

    We audit the source Adm Cloud tenant across tier (Packs vs Enterprise), active module list, CSV export capability, and data volume estimates per module. We enumerate every active module (financials, manufacturing, e-commerce, human management) and build a module-by-module object inventory. We confirm the export mechanism (UI CSV vs database read) and any row limits. For LATAM tenants, we identify tax code types (SAT, CFDI, VAT variants), currency configurations (MXN/USD/COP tri-currency or simpler), and any custom fields added to standard objects. The discovery output is a written migration scope document listing every object to be migrated, the expected record count per object, and a list of objects that require manual entry or post-migration configuration.

  2. Infor edition selection and tax regime pre-configuration

    We confirm the destination Infor Cloudsuite industry edition (Industrial, Distribution, Food & Beverage, Automotive, or another) with the customer because the edition determines the pre-configured data model, compliance settings, and available modules. We work with the customer's Infor administrator or Infor services partner to pre-configure the tax regime (particularly for LATAM: SAT codes, CFDI compliance settings, VAT rates per country) and the chart of accounts structure. The tax configuration step runs in parallel with data extraction and must be complete before AP/AR or invoice data is loaded because Infor validates tax codes at import time.

  3. Data extraction and staging transformation

    We extract data from Adm Cloud using the confirmed export mechanism (CSV or database read) in dependency order: chart of accounts first (no dependencies), then Customers and Vendors, then Items, then open AP and AR (with currency and tax data), then journal history (split by fiscal year), then fixed assets, then documents (file export with record-ID lookup), then user accounts. For each object we apply a staging transformation that maps Adm Cloud field names to Infor column names, casts data types to Infor-compatible formats, and applies any required filtering (inactive records excluded unless requested, journal lines without a valid account code flagged for resolution). The staging database mirrors the Infor migration utility's expected schema so that the utility can run against the staged data without modification.

  4. Infor Migration Utility run and Data Assessment Report review

    We run the Infor CloudSuite Migration Utility against the staged data using the predefined table mappings and sequences for standard objects. For any Adm Cloud fields without a predefined mapping, we add entries to the Import Source Tables and Import Target Tables forms per the Infor documentation. The utility generates a Data Assessment Report for each sequence; we review this report with the customer, correct any data quality issues flagged (unmapped tax codes, missing required fields, unbalanced journal entries), and iterate the staging transformation until the assessment passes. We do not commit data to the Infor production database until the assessment report shows zero blocking errors.

  5. Production migration in dependency order with reconciliation

    We migrate into the Infor production environment in strict dependency order: chart of accounts, Business Partners (customers and suppliers), Items, fixed assets (with opening balances), open AP/AR (with aging data), journal history (by fiscal period), and documents (re-linked to parent records). Each phase emits a row-count reconciliation report comparing Adm Cloud source counts to Infor target counts. We resolve any variances before proceeding to the next phase. For the journal migration, we run nightly batches and reconcile the GL trial balance to the Adm Cloud source after each batch. We flag any Adm Cloud recurring journal templates in a written automation inventory for the customer's admin to rebuild in Infor.

  6. Cutover, validation, and automation handoff

    We freeze Adm Cloud writes during the cutover window, run a final delta migration of any records created or modified since the last batch, validate the Infor GL trial balance and AP/AR aging report against Adm Cloud source reports, and hand over the system as the record of truth. We deliver the automation inventory document (recurring journals, any Adm Cloud workflow rules if applicable, e-commerce integration requirements) to the customer's Infor administrator or Infor services partner for rebuild. We do not rebuild Adm Cloud automations, forms, or report definitions inside Infor as part of the migration scope. We offer a one-week post-migration support window for reconciliation issues raised during the first production billing or inventory cycle.

Platform deep dives

Context on both ends of the pair

Adm Cloud logo

Adm Cloud

Source

Strengths

  • Native electronic billing for multiple Latin American tax regimes (CR, PA, DO, JM, and others) without third-party connectors.
  • Over 20 modules covering finance, CRM, inventory, manufacturing, HR, projects, and BI under one platform.
  • Microsoft Azure hosting with daily backups, three-server data replication, and intrusion detection.
  • Atina AI assistant for document processing and content suggestions.
  • Integrated customer portal supporting online ordering, payment processing, and service tickets.

Weaknesses

  • Performance can degrade during peak hours per verified reviewer feedback.
  • Coverage outside Latin America and the Caribbean is essentially non-existent.
  • Public pricing is not disclosed and both tiers require sales engagement.
  • Independent review volume is very low, limiting third-party validation.
  • Initial learning curve slows time-to-value for teams accustomed to modern SaaS onboarding.
Infor CloudSuite Corporate logo

Infor CloudSuite Corporate

Destination

Strengths

  • Industry-specific preconfiguration across manufacturing, distribution, healthcare, and food & beverage reduces post-implementation customization effort.
  • Deep Excel integration for financial reporting allows finance teams to export, manipulate, and push data back without leaving a familiar environment.
  • Multi-tenant AWS deployment with Infor OS provides a unified integration layer that simplifies connecting to third-party applications and legacy systems.
  • Strong multicurrency, multilanguage, and regulatory localization capabilities support organizations operating across 175+ countries from a single platform.
  • Modular architecture allows organizations to deploy core financials, supply chain, or manufacturing modules independently and expand over time.

Weaknesses

  • Opaque pricing model with no public per-user rates and deployments commonly ranging from $500K to $5M creates significant budget uncertainty for prospective buyers.
  • Implementation complexity and timeline (commonly 2+ years for large deployments) leads to extended periods of reduced productivity and elevated project risk.
  • Steep learning curve with hidden options and a lack of public setup guidance makes self-service onboarding difficult compared to competitors with richer documentation communities.
  • Manufacturing module functionality is perceived by some users as outdated relative to modern ERP platforms, with reported bug issues that require workarounds.
  • Tight coupling between modules and environment-specific configurations makes migration to non-Infor systems labor-intensive, increasing switching costs.

Complexity grading

How hard is this migration?

Standard ERP migration. 1 of 8 objects need a mapping; the rest are 1:1.

B

Overall complexity

Standard migration

Derived from compatibility, mapping clarity, API constraints, and data volume across Adm Cloud and Infor CloudSuite Corporate.

  • Object compatibility

    B

    1 of 8 objects need a mapping; the rest are 1:1.

  • Field mapping clarity

    C

    Field mapping is derived from defaults — final spec confirmed during the sample migration.

  • Timeline complexity

    B

    8-object category — typical timelines run 2–7 days end-to-end.

  • API constraints

    B

    Adm Cloud: Not publicly documented.

  • Data volume sensitivity

    B

    Adm Cloud doesn't expose a bulk API — REST + parallelization used for high-volume runs.

Estimator

Estimate your Adm Cloud to Infor CloudSuite Corporate migration cost

Rule-based pricing — no per-record fees, no manual quotes. Migrations over 2M records are scoped individually.

Step 1

What are you migrating?

Pick a category, then your source and destination platforms.

Category

FAQ

Frequently asked questions about Adm Cloud to Infor CloudSuite Corporate data migrations

Answers to the questions buyers ask most during Adm Cloud to Infor CloudSuite Corporate migration scoping. Not seeing yours? Book a call.

Can't find your answer?

Walk through your Adm Cloud to Infor CloudSuite Corporate migration with a real engineer — 30 minutes, free, written quote within 24 hours.

Book a free 30 minute consultation

Most Adm Cloud migrations land between six and ten weeks for tenants with up to 50,000 items, 10,000 customers, and clean AP/AR aging under two years. Enterprise-tier Adm Cloud tenants with custom objects, large journal histories (five or more years, 500,000+ line items), fixed-asset depreciation schedule mapping, or tri-currency LATAM configurations move to twelve to twenty weeks because of the staging transformation complexity, tax regime configuration, and multi-phase journal reconciliation. The Infor Cloudsuite subscription and any Infor implementation partner work run in parallel and do not count against the data migration timeline.

Adjacent paths

Related migrations to explore

Ready when you are

Move from Adm Cloud.
Land in Infor CloudSuite Corporate, intact.

Tell us record counts and timeline. We'll come back with a written quote inside 1 business day — no commitment, no sales pitch.

Accuracy guarantee Rollback included Quote in 1 business day