ERP migration
Field-level mapping, validation, and rollback between Masterplan and Acumatica. We move data and schema; workflows are rebuilt natively in Acumatica.
Masterplan
Source
Acumatica
Destination
Compatibility
13 of 13
objects map 1:1 between Masterplan and Acumatica.
Complexity
BStandard
Timeline
10–15 business days
Overview
Masterplan and Acumatica both target mid-market manufacturers and distributors, but their data models diverge significantly at the project-accounting layer. Masterplan stores projects as flat objects with cost categories; Acumatica nests Project Tasks under Project records with separate Work Types and Cost Codes. The chart of accounts structure differs — Masterplan uses a flat segment model while Acumatica supports multi-segment account codes that must reconcile against your existing General Ledger before the migration commits. FlitStack AI extracts Masterplan data via its REST API (respecting per-endpoint rate limits), stages the data for Acumatica's Import by Scenario framework, and maps customers to the Customer table, vendors to the Vendor table, and stock items to the InventoryItem DAC. Projects translate into the PMProject table with tasks split into PMTask, cost categories into CostCodes, and budget lines into PMBudget. We surface the GL account mapping as a pre-migration deliverable so your accountant can cross-check segment definitions before any data lands in Acumatica. Workflows, approval rules, and custom scripts do not migrate — we export your Masterplan workflow definitions as a rebuild reference for Acumatica's Screen-based Workflow Engine.
Every standard and custom field arrives verified.
AI proposes the map; you confirm before any record moves.
Parent–child, lookups, and ownership stay linked.
Calls, emails, meetings — with original timestamps.
Documents, uploads, and inline notes move with the record.
Why teams make this switch
Leaving
What's pushing teams away
Choosing
What's pulling them in
Object mapping
Each row shows how a Masterplan object lands in Acumatica, including any object-level transformations, lookup resolution, or schema-design dependencies.
Typical mapping — final map is confirmed during the sample migration step.
Masterplan
Customer
Acumatica
Customer
1:1Masterplan customers map directly to Acumatica's Customer DAC. The primary address and contact email transfer as the default location and contact info. Masterplan's customer type (e.g., prospect vs. house account) translates to the CustomerClassID pick-list on the Acumatica Customer screen.
Masterplan
Vendor
Acumatica
Vendor
1:1Masterplan vendors map to Acumatica's Vendor DAC. The Remit-to address and payment terms transfer as the default location. Masterplan's vendor type or category maps to the VendorClassID pick-list — we create matching class records in Acumatica before migration if none exist.
Masterplan
Stock Item
Acumatica
InventoryItem
1:1Masterplan stock items become Acumatica InventoryItem records. Item type (stock vs. non-stock vs. service) maps to the ItemType pick-list. The base unit of measure and any alternate UOMs transfer to the Units of Measure tab on the InventoryItem screen, allowing flexible measurement conversions in Acumatica's inventory management.
Masterplan
Warehouse / Location
Acumatica
Warehouse + LocationID
1:1Masterplan warehouse-level inventory maps to Acumatica Warehouse records, with each Masterplan location becoming a LocationID record within the corresponding Warehouse. If Masterplan tracks bin or lot data, Acumatica's Lot/Serial class and Location class must be enabled before migration — we flag this in the pre-migration schema plan.
Masterplan
Project / Job
Acumatica
PMProject + PMTask
1:1Masterplan projects map to Acumatica's PMProject DAC. The project type (Time and Materials, Fixed Price, etc.) maps to the TemplateID which drives the default Cost Code and Work Type structure. Each Masterplan cost category becomes a Cost Code in Acumatica's PM Cost Codes screen — we deliver a Cost Code mapping table before migration.
Masterplan
Project Cost Category
Acumatica
PM Cost Code
1:1Masterplan cost categories transfer as PM Cost Code records linked to the destination Project template. Budget amounts per cost category map to PMBudget lines on the project. Rate-based cost codes require a corresponding Work Type with default hourly or unit rates configured in Acumatica.
Masterplan
Purchase Order
Acumatica
PurchaseOrder
1:1Open Masterplan purchase orders map to Acumatica's PO303000 screen (Purchase Orders). Line items reference the migrated InventoryItem records by InventoryID. Taxes, terms, and shipping information transfer to the Details and Terms tabs. Closed POs migrate as historical records linked to the Vendor.
Masterplan
Sales Order
Acumatica
SalesOrder
1:1Open Masterplan sales orders transfer to Acumatica's SO301000 screen (Sales Orders). Customer and location links resolve via the migrated Customer records. Line items reference migrated stock items. Freight, discount, and tax fields map to their corresponding Acumatica fields by name.
Masterplan
GL Account
Acumatica
Account
1:1Masterplan GL accounts require a manual cross-validation step before migration — Acumatica's chart of accounts segment structure is defined in Settings → Chart of Accounts. We deliver an account mapping spreadsheet that pairs each Masterplan account code with the corresponding Acumatica AccountCD. Closed or inactive Masterplan accounts are flagged for Acumatica deactivation after migration.
Masterplan
Custom Field (any entity)
Acumatica
User-Defined Field (UDF)
1:1Masterplan custom fields on any entity map to Acumatica User-Defined Fields created via the Customization Project Editor (SM200505). We export the Masterplan custom field definitions (label, data type, pick-list values) and recreate them as UDFs on the corresponding Acumatica DAC before data loads. Large text or multi-select custom fields require verification that the UDF data type in Acumatica supports the same value range.
Masterplan
Project Budget Line
Acumatica
PMBudget
1:1Masterplan project budget lines by cost category map to PMBudget records on the corresponding Acumatica project. Quantity budgets and amount budgets transfer separately. Revenue budgets for Fixed Price projects map to the Revenue Budget tab. Variance tracking between committed and actual costs uses Acumatica's built-in PM reporting.
Masterplan
Production Order
Acumatica
ProductionOrder (Manufacturing)
1:1Masterplan production orders and the associated material BOM and routing data do not have a direct Acumatica equivalent without the Manufacturing Edition active. We migrate production order headers and line summaries as reference records in a custom table; BOMs and routings must be rebuilt in Acumatica's Production BOM and Production Routing screens. If Manufacturing Edition is not licensed, these records are preserved as custom reference objects.
Masterplan
User / Owner
Acumatica
Users (Contact)
1:1Masterplan user IDs resolve against Acumatica users by email address match. Unmatched owners are flagged before migration — your team either creates Acumatica user accounts first or assigns records to a fallback owner. Project managers and approvers with pending approval chains are migrated as Contacts with the OwnerID link populated where applicable.
| Masterplan | Acumatica | Compatibility | |
|---|---|---|---|
| Customer | Customer1:1 | Fully supported | |
| Vendor | Vendor1:1 | Fully supported | |
| Stock Item | InventoryItem1:1 | Fully supported | |
| Warehouse / Location | Warehouse + LocationID1:1 | Fully supported | |
| Project / Job | PMProject + PMTask1:1 | Fully supported | |
| Project Cost Category | PM Cost Code1:1 | Fully supported | |
| Purchase Order | PurchaseOrder1:1 | Fully supported | |
| Sales Order | SalesOrder1:1 | Fully supported | |
| GL Account | Account1:1 | Fully supported | |
| Custom Field (any entity) | User-Defined Field (UDF)1:1 | Fully supported | |
| Project Budget Line | PMBudget1:1 | Fully supported | |
| Production Order | ProductionOrder (Manufacturing)1:1 | Fully supported | |
| User / Owner | Users (Contact)1:1 | Fully supported |
Gotchas + challenges
Platform-specific issues from each side, plus the pair-specific challenges that don't show up on either platform's page on its own.
Masterplan gotchas
No publicly documented API or bulk export endpoint
Vendor lock-in on support-assisted data extraction
Single verified review and sparse community data
Custom field handling is undocumented
Transactional history depth varies by customer configuration
Acumatica gotchas
API user licenses cap concurrent sessions and request throughput
Multi-tenant filtering requires CompanyID awareness
Custom fields require separate discovery before field mapping
Notes and attachments use a separate linked table structure
Implementation timelines frequently run 3–9 months end-to-end
Pair-specific challenges
Migration approach
Discover Masterplan data inventory and Acumatica schema prerequisites
We run a scoped read of your Masterplan REST API to inventory all entities: customers, vendors, stock items, projects, cost categories, budget lines, purchase orders, sales orders, and any custom fields. Simultaneously, we assess your target Acumatica tenant — identifying which modules are licensed (Financial Management, Distribution, Manufacturing, Construction, CRM), whether branches and multi-entity are configured, and what the chart of accounts segment structure looks like. We deliver a Masterplan-to-Acumatica schema plan within three business days that lists every entity to migrate, every custom field requiring UDF creation, and every GL account requiring manual cross-validation.
Deliver GL account mapping and UDF specification for pre-migration setup
The Acumatica chart of accounts segment structure must be finalized before any transactional data loads — otherwise transaction lines post to the wrong accounts. We deliver a GL account mapping spreadsheet pairing each Masterplan account code with its Acumatica AccountCD equivalent. We also deliver a UDF specification document listing every Masterplan custom field with its label, data type, and pick-list values, so your Acumatica admin can create the corresponding User-Defined Fields in the Customization Project Editor before the migration run. Both deliverables require your accountant's sign-off before we proceed to data extraction.
Extract master data in dependency order using Masterplan REST API
We extract Masterplan data via its REST API using a staged approach that respects dependency order: master data first (customers, vendors, stock items), then GL account mapping resolution, then project structures (projects → tasks → cost codes → budget lines), then transactional documents (open purchase orders, open sales orders). The Masterplan API applies per-endpoint rate limits; we pace extraction requests and checkpoint every 1,000 records to prevent API throttling. All extractions are staged in a temporary cloud storage bucket with SHA-256 checksums so the data can be verified before it enters Acumatica.
Run a sample migration with field-level diff before the full migration
A representative slice of 100–300 records spanning customers, vendors, stock items, one project with tasks and cost codes, and an open PO is loaded into Acumatica first. We generate a field-level diff report comparing source values in Masterplan against their landed values in Acumatica. You verify that account mappings resolved correctly, that UDF values populated, that project task nesting is intact, and that cost code assignments match your expectations. Any mapping errors are corrected in the transformation scripts before the full migration commits.
Execute full migration with delta-pickup and post-migration validation
The full migration loads into Acumatica using Acumatica's Import by Scenario framework for structured records (customers, vendors, items, projects) and direct API inserts for PMTask and PMBudget lines. A delta-pickup window of 24–48 hours captures any records created or modified in Masterplan during the cutover. We run post-migration validation checks: record counts per entity, account balance reconciliation against Masterplan trial balance, and project budget vs. actual cross-check. An audit log records every insert and update; one-click rollback reverts the Acumatica tenant to its pre-migration state if reconciliation fails.
Platform deep dives
Masterplan
Source
Strengths
Weaknesses
Acumatica
Destination
Strengths
Weaknesses
Complexity grading
Standard ERP migration. 1 of 8 objects need a mapping; the rest are 1:1.
Overall complexity
Standard migration
Derived from compatibility, mapping clarity, API constraints, and data volume across Masterplan and Acumatica.
Object compatibility
1 of 8 objects need a mapping; the rest are 1:1.
Field mapping clarity
Field mapping is derived from defaults — final spec confirmed during the sample migration.
Timeline complexity
8-object category — typical timelines run 2–7 days end-to-end.
API constraints
Masterplan: Not publicly documented.
Data volume sensitivity
Masterplan doesn't expose a bulk API — REST + parallelization used for high-volume runs.
Estimator
Rule-based pricing — no per-record fees, no manual quotes. Migrations over 2M records are scoped individually.
Step 1
Pick a category, then your source and destination platforms.
Category
FAQ
Answers to the questions buyers ask most during Masterplan to Acumatica migration scoping. Not seeing yours? Book a call.
Walk through your Masterplan to Acumatica migration with a real engineer — 30 minutes, free, written quote within 24 hours.
Book a free 30 minute consultationAdjacent paths
Other ways to leave Masterplan
Other ways to arrive at Acumatica
Ready when you are
Tell us record counts and timeline. We'll come back with a written quote inside 1 business day — no commitment, no sales pitch.