Project Management migration
Field-level mapping, validation, and rollback between KANNA and monday Work Management. We move data and schema; workflows are rebuilt natively in monday Work Management.
KANNA
Source
monday Work Management
Destination
Compatibility
9 of 12
objects map 1:1 between KANNA and monday Work Management.
Complexity
BStandard
Timeline
4-6 weeks
Overview
Moving from KANNA to monday.com trades a construction-specific PM tool for a general-purpose Work OS that offers broader automation, larger integration ecosystem, and more flexible reporting. KANNA's data export covers Projects, Customers, Properties, and Reports, but does not include chat threads, comments, or reporting threads as named export categories. We extract what KANNA exports cleanly and flag the gaps before migration begins. Sub-project hierarchies in KANNA map to Groups inside monday.com Boards, and KANNA's task dependencies and Gantt chart data reconstruct using monday.com's Timeline column. Custom input fields are template-bound in KANNA; we capture their definitions and values, then map them to monday.com custom columns on the target Board. Automations, approval flows, and bulletin board features do not migrate as code. We deliver a written inventory of every automation and approval flow so the customer's admin can rebuild them in monday.com's automation builder post-migration.
Every standard and custom field arrives verified.
AI proposes the map; you confirm before any record moves.
Parent–child, lookups, and ownership stay linked.
Calls, emails, meetings — with original timestamps.
Documents, uploads, and inline notes move with the record.
Why teams make this switch
Leaving
What's pushing teams away
Choosing
What's pulling them in
Object mapping
Each row shows how a KANNA object lands in monday Work Management, including any object-level transformations, lookup resolution, or schema-design dependencies.
Typical mapping — final map is confirmed during the sample migration step.
KANNA
Project
monday Work Management
Board
1:1KANNA Projects map directly to monday.com Boards. We preserve the Project name, status, date range, and client/property association as Board metadata. KANNA's Project-level custom input fields (template-bound fields configured via Settings) map to custom columns on the target Board. Each Board is created in a monday.com Workspace that corresponds to the customer's operational grouping.
KANNA
Task
monday Work Management
Item
1:1KANNA Tasks map to monday.com Items. The task name, description, due date, assignee, and status migrate directly. We preserve the parent-child hierarchy by placing each Item in the appropriate Group (derived from the parent Sub-project if present) on the Board. KANNA task status values map to monday.com Status column values, and we flag any KANNA custom status that requires a new Status option to be added to the destination Board.
KANNA
Sub-project
monday Work Management
Group
1:1KANNA Sub-projects allow work to be split into phases or multi-site work within a parent Project. We map Sub-projects to monday.com Groups on the corresponding Board. The Group name carries the Sub-project title, and all child Tasks land inside that Group as Items. If monday.com's Group naming conventions conflict with the Sub-project naming (e.g., if the Sub-project name is unusually long), we truncate to monday.com's Group name limit and note the original name in the Item description.
KANNA
Custom Input Fields (Project Templates)
monday Work Management
Custom Columns
lossyKANNA custom fields are configured per project template via Settings > Customize Settings and are not global fields. We capture the field definition (name, type, required status) and the stored values on each Project record. In monday.com, we create matching custom columns on the target Board using the closest available column type (text, number, date, dropdown, or checkbox). If the KANNA field is a multi-value field, we use monday.com's multi-select column type.
KANNA
Photo Report / Photo
monday Work Management
Image Column or Attachment
1:1KANNA Photo Reports are a first-class export in KANNA's Data Import/Export feature. We extract photos and their captions and attach them to the corresponding Item in monday.com using the native image upload or file attachment feature. The caption becomes a text note on the attachment or a column value on a dedicated notes column. Photo metadata (date taken, uploader) migrates to a custom text column if the customer requires it.
KANNA
Document
monday Work Management
File Attachment
1:1Documents associated with Projects and Tasks in KANNA migrate as file attachments on the corresponding Item in monday.com. Document content itself is not extracted or transformed; the file is preserved in its original format and attached to the Item. We log the original document name and any KANNA-specific folder path as a text note for traceability.
KANNA
Comments / Chat / Reporting Threads
monday Work Management
Item Updates / Comments
1:1KANNA's in-platform chat and reporting threads on Projects and Tasks are not listed as a named export category in KANNA's Data Import/Export documentation. We extract them where they appear in the export format or UI, but this is a known gap. We flag any Project or Task with missing thread history before migration begins and advise the customer to manually archive critical threads. Threads that are extractable migrate as monday.com Item Updates with author, timestamp, and text content preserved.
KANNA
Client / Property
monday Work Management
Contact or Text Column
1:1KANNA separates customer information and property information as distinct data types in its Data Import/Export feature. We map KANNA Clients to monday.com contacts if the customer uses monday CRM, or to a text column on the Board if Work Management is the destination product. KANNA Properties map to a text or link column capturing the property name, address, and reference. The mapping type depends on the customer's monday.com product tier and intended use of property data post-migration.
KANNA
Gantt Chart Data
monday Work Management
Timeline Column
1:1KANNA displays project timelines as a Gantt Chart derived from task start dates, end dates, and dependencies. We extract the underlying task date fields from KANNA and reconstruct the timeline in monday.com using the Timeline column (available on Standard and above). KANNA task dependencies map to monday.com Dependency columns. We note that monday.com's Gantt view renders the same Timeline data in a Gantt-style visual; the underlying data structure is identical.
KANNA
Pipeline Stages / Statuses
monday Work Management
Status Column Values
lossyProject and Task statuses in KANNA are configurable per workspace. We capture the full status taxonomy during scoping and create matching Status column values on the destination Board. KANNA's status color coding maps to monday.com's Status color options. If the customer uses KANNA's Pro Plus approval flow, the approval statuses (pending, approved, rejected) map to specific Status values that we configure before migration begins.
KANNA
User / Assignee
monday Work Management
Board Member
1:1KANNA user accounts and task assignments export separately. We map each KANNA user to a monday.com user by email address. If a monday.com account does not exist for a KANNA assignee, we flag that assignee in the reconciliation report and the customer provisions the account before migration resumes. Assignees without a destination account after provisioning are set to the board admin or a designated fallback user.
KANNA
Approval Flow
monday Work Management
Automation Rules
lossyKANNA's Pro Plus approval flow feature does not have a direct monday.com equivalent as a migration artifact. We capture the approval chain structure (approver list, approval stages, notification triggers) as a written specification and deliver it to the customer's admin to rebuild using monday.com's automation recipes. The customer may also consider monday.com's built-in approval workflow feature if available on their plan.
| KANNA | monday Work Management | Compatibility | |
|---|---|---|---|
| Project | Board1:1 | Fully supported | |
| Task | Item1:1 | Fully supported | |
| Sub-project | Group1:1 | Fully supported | |
| Custom Input Fields (Project Templates) | Custom Columnslossy | Mapping required | |
| Photo Report / Photo | Image Column or Attachment1:1 | Fully supported | |
| Document | File Attachment1:1 | Fully supported | |
| Comments / Chat / Reporting Threads | Item Updates / Comments1:1 | Mapping required | |
| Client / Property | Contact or Text Column1:1 | Fully supported | |
| Gantt Chart Data | Timeline Column1:1 | Mapping required | |
| Pipeline Stages / Statuses | Status Column Valueslossy | Mapping required | |
| User / Assignee | Board Member1:1 | Fully supported | |
| Approval Flow | Automation Ruleslossy | Fully supported |
Gotchas + challenges
Platform-specific issues from each side, plus the pair-specific challenges that don't show up on either platform's page on its own.
KANNA gotchas
Minimum seat billing regardless of usage
Chat threads and reporting comments may not export cleanly
Custom input fields are template-bound, not global
Enterprise plan not available in Japan and Thailand
No documented public API for automated migration
monday Work Management gotchas
Subitems have no bulk export endpoint
API complexity budget constrains query depth
Daily call limits vary sharply across plan tiers
Automation and integration rules do not export via API
Saved views are not exposed via API
Pair-specific challenges
Migration approach
Discovery and export scoping
We audit the KANNA workspace across all plans and templates. We document every Project, Sub-project, and Task with record counts; identify all custom input fields and their per-template assignments; extract the status taxonomy and approval flow configuration; inventory photo reports and document attachment volumes; and identify all user accounts and their active assignments. We use KANNA's native Data Import/Export to pull the available data and cross-reference it against the scoping inventory to identify export gaps (chat threads, comments, reporting threads). The output is a written migration scope with a data completeness assessment.
Destination Board schema design
We design the monday.com destination schema based on the KANNA scoping output. Each KANNA Project becomes a Board. Each Sub-project becomes a Group on that Board. Each KANNA task status becomes a monday.com Status column value. Each template-bound custom field becomes a custom column on the target Board. We create any additional columns (image, file, date, timeline) needed for photo reports, documents, and Gantt reconstruction. If the customer uses monday CRM, we configure the contact and account schema for client and property data. Schema is validated in a monday.com test workspace before production migration begins.
User reconciliation and workspace provisioning
We extract every distinct KANNA user referenced on a Task (as assignee) or Project (as owner) and match by email against the destination monday.com workspace. Users without a monday.com account go to a reconciliation queue for the customer to provision before migration. If the customer uses monday CRM, we also configure the contact records for KANNA Clients that map to CRM contacts.
Gantt and timeline reconstruction
KANNA's Gantt chart data is derived from task start dates, end dates, and dependencies. We extract these fields from the KANNA export and configure a Timeline column on each destination Board. KANNA task dependencies map to monday.com Dependency columns (available on Pro and above). If the customer is on Standard tier, dependencies are captured as text columns noting the dependent item name. The Timeline column renders the Gantt visual in monday.com's Gantt view.
Production migration in dependency order
We run production migration in record-dependency order: Board structure (Workspaces, Boards, Groups) created first; custom columns configured per Board; Items (from Tasks) inserted with Status, assignee, due date, and timeline values; photo reports and documents attached to the corresponding Items; comments and chat threads migrated as Item Updates where extractable; and user assignments resolved at insert time. Each phase emits a row-count reconciliation report before the next phase begins. KANNA writes are frozen during cutover and a final delta migration captures any records modified during the migration window.
Cutover, validation, and automation inventory delivery
We enable monday.com as the system of record after confirming record counts match between source and destination. We deliver the automation and approval flow inventory document to the customer's monday.com admin with a recommended rebuild sequence. We support a one-week hypercare window where we resolve reconciliation issues raised by the team. We do not rebuild KANNA automations or approval flows as monday.com automations inside the migration scope; that work is a separate engagement or an internal admin task.
Platform deep dives
KANNA
Source
Strengths
Weaknesses
monday Work Management
Destination
Strengths
Weaknesses
Complexity grading
Standard Project Management migration. 2 of 8 objects need a mapping; the rest are 1:1.
Overall complexity
Standard migration
Derived from compatibility, mapping clarity, API constraints, and data volume across KANNA and monday Work Management.
Object compatibility
2 of 8 objects need a mapping; the rest are 1:1.
Field mapping clarity
Field mapping is derived from defaults — final spec confirmed during the sample migration.
Timeline complexity
8-object category — typical timelines run 2–7 days end-to-end.
API constraints
KANNA: Not publicly documented.
Data volume sensitivity
KANNA doesn't expose a bulk API — REST + parallelization used for high-volume runs.
Estimator
Rule-based pricing — no per-record fees, no manual quotes. Migrations over 2M records are scoped individually.
Step 1
Pick a category, then your source and destination platforms.
Category
FAQ
Answers to the questions buyers ask most during KANNA to monday Work Management migration scoping. Not seeing yours? Book a call.
Walk through your KANNA to monday Work Management migration with a real engineer — 30 minutes, free, written quote within 24 hours.
Book a free 30 minute consultationAdjacent paths
Other ways to leave KANNA
Other ways to arrive at monday Work Management
Same-Project Management migrations
Ready when you are
Tell us record counts and timeline. We'll come back with a written quote inside 1 business day — no commitment, no sales pitch.